Figure 16.11 Ultimate Pit Design – Plan View<br />

The dimensions and related statistics of the ultimate pit design are provided in Table<br />

16.8.<br />

Table 16.8 General Pit Statistics<br />

Item Size<br />

Approximate Pit Top Elevation 1,920 m<br />

Pit Bottom Elevation 920 m<br />

Approximate Pit Depth 1,000 m<br />

Volume of Pit 508,000,000 m 3<br />

Area of Pit Limits 2,200,000 m 2<br />

Perimeter of Pit Limits 6,420 m<br />

Length from East to West 2,500 m<br />

Length from North to South 1,400 m<br />

16.6.1 ULTIMATE P IT DESIGN CRITERIA<br />

The ultimate pit design was based on the design criteria presented in Table 16.9.<br />

Prophecy Platinum Corp. 16-19 1193460500-REP-R0001-02<br />

<strong>Wellgreen</strong> <strong>Project</strong> <strong>Preliminary</strong> <strong>Economic</strong> <strong>Assessment</strong>,<br />

Yukon, Canada

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!