equipment costs based on surveys of operating <strong>com</strong>panies and vendors.<br />

Allowances were made for process pumping, reagent preparation, and an<br />

assay/process laboratory. The total process capital cost including<br />

installation/construction is US$174.3 million.<br />

21.2.6 INITIAL CAPITAL COSTS<br />

The initial capital costs consist of four main parts: direct costs, indirect costs,<br />

contingency and owner’s costs.<br />

The initial direct and indirect capital costs are summarized in Table 21.3.<br />

ESTIMATE STRUCTURE<br />

Any costs incurred with work that is scheduled to start after Year 1 are included in<br />

the sustaining capital costs and are not in the initial capital cost estimate.<br />

PRICING<br />

This PEA study estimate was prepared with a base date of Q1 2012 and has not<br />

included any escalation beyond this date.<br />

CONSTRUCTION LABOUR RATES AND PRODUCTIVITY<br />

A blended labour rate of Cdn$108/h is used throughout. Tetra Tech has assumed a<br />

“three weeks in, one week out” work schedule.<br />

The labour rates include the following items:<br />

• vacation and statutory holiday pay<br />

• fringe benefits and payroll burdens<br />

• overtime and shift premiums<br />

• small tools<br />

• consumables<br />

• personal protection equipment<br />

• contractor’s overhead and profit.<br />

In addition, indirect costs which are calculated separately, are included in the<br />

following categories:<br />

• all additional construction equipment, cranes, and incidental equipment<br />

rentals; contractors and construction costs are included in the individual line<br />

items of estimate<br />

Prophecy Platinum Corp. 21-6 1193460500-REP-R0001-02<br />

<strong>Wellgreen</strong> <strong>Project</strong> <strong>Preliminary</strong> <strong>Economic</strong> <strong>Assessment</strong>,<br />

Yukon, Canada