29.11.2014 Views

DOE 2000. - Waste Isolation Pilot Plant - U.S. Department of Energy

DOE 2000. - Waste Isolation Pilot Plant - U.S. Department of Energy

DOE 2000. - Waste Isolation Pilot Plant - U.S. Department of Energy

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

WIPP RH PSAR <strong>DOE</strong>/WIPP-03-3174 CHAPTER 3<br />

Table 3.2-3, Design Loads for Surface Structures (1)<br />

DESIGN<br />

CLASS<br />

STRUCTURE SEISMIC TORNADO<br />

DBT<br />

DBE UBC<br />

SNOW<br />

lb/ft 2<br />

WIND<br />

mi/hr<br />

Class II <strong>Waste</strong> Handling Building X (2) X 27 110<br />

Class II Station A X X 27 110<br />

Class IIIA Support Building (3) X (3) 10 99<br />

Class IIIA Exhaust Filter Building X 10 99<br />

Class IIIA Building 412 (3) X (3) 27 110<br />

Class IIIB Warehouse/Shops Building X 10 91<br />

Class IIIB Water Pumphouse X 10 91<br />

Class IIIB<br />

SH Shaft Hoist House &<br />

Electrical Room<br />

X 10 91<br />

Notes:<br />

(1) For definition <strong>of</strong> various loads, see Section 3.2.9.1.<br />

(2) "X" indicates applicable load.<br />

(3) The main lateral force resisting members <strong>of</strong> the Support Building and Building 412 shall be designed for DBE and DBT to protect the<br />

<strong>Waste</strong> Handling Building from structural failure.<br />

3.2-18 January 22, 2003

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!