WIPP RH PSAR <strong>DOE</strong>/WIPP-03-3174 CHAPTER 4<br />

Table 4.8-1 Human Factors Evaluation Requirements <strong>of</strong> Design Class II/IIIA SSCs Page 4 <strong>of</strong> 7<br />

Table 4.1-1 Description<br />

Functional<br />

Allocation<br />

System/Component<br />

Design<br />

Class<br />

UNDERGROUND VENTILATION SYSTEM (SDD-VU00)<br />

Design Class Function<br />

Human Errors Impacting<br />

Safety Function<br />

(Excluding Design,<br />

Maintenance, and Testing)<br />

and Consequence.<br />

Human<br />

Factors<br />

Screening<br />

Results<br />

Exhaust duct elbow at the top <strong>of</strong> the<br />

Exhaust Shaft<br />

II<br />

Design Class Interface.<br />

(Channels exhaust air to the EFB)<br />

Passive Mechanisms None Adequate<br />

HEPA Filters and <strong>Isolation</strong> Dampers II Control <strong>of</strong> radioactive effluent Passive Mechanisms None Adequate<br />

Exhaust Fans for the filtration mode<br />

II<br />

Design Class Interface.<br />

(Channels exhaust air through the<br />

EFB)<br />

Passive Mechanisms None Adequate<br />

Exhaust System Instruments and<br />

Hardware<br />

IIIA<br />

Design Class Interface.<br />

(Supports Exhaust Filtration<br />

System)<br />

Passive Mechanisms None Adequate<br />

(6) High Pressure Fans for Bulkhead 309<br />

(Pressure Chamber)<br />

IIIA<br />

Maintain buffer zone between<br />

RMA and non-RMA<br />

Passive Mechanisms None Adequate<br />

WASTE HANDLING EQUIPMENT (SDD-WH00)<br />

Facility Cask II Provides permanent shielding Passive Mechanisms None Adequate<br />

25-Ton Crane - CUR IIIA Failure could cause radioactive<br />

materials release<br />

Active - In use<br />

manual<br />

Failure could lead to<br />

initiating event for RH<br />

Accident Release<br />

Adequate<br />

Telescoping Port Shield II Provides permanent shielding Passive Mechanisms None Adequate<br />

Shield Bell II Provides permanent shielding Passive Mechanisms None Adequate<br />

CUR Floor Shield Valve II Provides permanent shielding Passive Mechanisms None Adequate<br />

Hot Cell Shield Valve II Provides permanent shielding Passive Mechanisms None Adequate<br />

4.8-7 January 28, 2003