WIPP RH PSAR <strong>DOE</strong>/WIPP-03-3174 APPENDIX C<br />

Table 1- 72B HAZOP Table<br />

Study Node<br />

Event No.<br />

Deviation Causes Consequences Existing Safeguards Actions or<br />

Recommendations<br />

Total Rank<br />

(Cons.,Freq )<br />

Radiological Rank<br />

(Cons.,Freq)<br />

Comments<br />

12-3 Loss <strong>of</strong><br />

ventilation<br />

(ventilation<br />

requirements<br />

between RH<br />

and CH<br />

processes are<br />

not maintained)<br />

Human Error-<br />

Improper<br />

bulkhead<br />

alignment<br />

Equipment<br />

Failure - Failure<br />

<strong>of</strong> exhaust fans;<br />

Utility Failure -<br />

Loss <strong>of</strong> power<br />

Potential to<br />

shutdown<br />

operations<br />

Underground ventilation<br />

system alignment procedures;<br />

Worker training;<br />

Preventive Maintenance<br />

Program for ventilation system<br />

equipment;<br />

Redundant exhaust fans;<br />

Evacuation plan<br />

NAI NA NA No release <strong>of</strong><br />

radiological<br />

materials<br />

13 - General Facility operation - NPH, External events<br />

13-1 Seismic Event<br />

(Design Basis<br />

Earthquake)<br />

Earthquake<br />

Potential for<br />

major disruption<br />

<strong>of</strong> facility<br />

operations;<br />

Potential damage<br />

to cask and/or<br />

canister;<br />

Potential breach<br />

<strong>of</strong> canister;<br />

Potential for loss<br />

<strong>of</strong> site utilities;<br />

Potential to<br />

release radioactive<br />

material;<br />

Potential for<br />

radiological<br />

exposure to <strong>of</strong>fsite<br />

personnel;<br />

Potential for fire;<br />

Potential for<br />

explosion;<br />

Potential for<br />

worker injury or<br />

fatality<br />

<strong>Waste</strong> Handling Building<br />

designed for DBE;<br />

Emergency Response Plan;<br />

Recovery Plan;<br />

Road cask design - meets DOT<br />

Type B shipping container<br />

certification requirements;<br />

HVAC system shutdown<br />

switch<br />

NAI 4,3 Facility Worker -<br />

4,3<br />

Onsite Worker - 4,3<br />

Offsite - 4,3<br />

Worker injury or<br />

fatality could<br />

occur as the<br />

result <strong>of</strong> the<br />

earthquake<br />

alone.<br />

Radiological<br />

impact would<br />

likely be<br />

extensive.<br />

C-25 January 23, 2003