29.11.2014 Views

DOE 2000. - Waste Isolation Pilot Plant - U.S. Department of Energy

DOE 2000. - Waste Isolation Pilot Plant - U.S. Department of Energy

DOE 2000. - Waste Isolation Pilot Plant - U.S. Department of Energy

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

WIPP RH PSAR <strong>DOE</strong>/WIPP-03-3174 APPENDIX C<br />

Table 2- 10-160B HAZOP Table<br />

Study Node<br />

Event No.<br />

Deviation Causes Consequences Existing Safeguards Actions Total Rank<br />

(Cons., Freq)<br />

Radiological Rank<br />

(Cons.,Freq)<br />

Comments<br />

20-5 Cold Weather<br />

Natural<br />

Ventilation<br />

Pressure results<br />

in changes to<br />

air balance<br />

(Underground<br />

ventilation<br />

system)<br />

Cold weather<br />

caused Natural<br />

Ventilation<br />

Pressure (NVP)<br />

Potential to<br />

disrupt waste<br />

handling<br />

operations;<br />

Potential to, in the<br />

event <strong>of</strong> an<br />

accident involving<br />

release <strong>of</strong><br />

radiological<br />

material, spread<br />

airborne<br />

contamination to<br />

the environment;<br />

Potential to cause<br />

deterioration <strong>of</strong><br />

braking and<br />

electronic systems<br />

for the waste shaft<br />

hoist during<br />

prolonged<br />

exposure to salt;<br />

Potential for waste<br />

shaft hoist to fail;<br />

Potential for<br />

worker injury<br />

Operator training and<br />

qualification;<br />

<strong>Waste</strong> shaft hoist system<br />

design;<br />

Operating procedures;<br />

Air balance and flow tests;<br />

Shaft pressure monitoring;<br />

Alarms to indicate adverse air<br />

pressure conditions;<br />

WIPP ventilation simulator<br />

used for guidance;<br />

Underground ventilation<br />

remote monitoring control<br />

system (monitors air flows and<br />

d/p’s and enable CMR operator<br />

to adjust vortex to control<br />

flow)<br />

Mine weather stations to<br />

monitor natural ventilation<br />

pressure(temp, relative<br />

humidity and barometric<br />

pressure);<br />

<strong>Isolation</strong> <strong>of</strong> mine splits;<br />

Backup power available to<br />

operate fans for flow through<br />

the panel area<br />

NAI 3,4 NA There would be<br />

no radiological<br />

hazard as the<br />

result <strong>of</strong> the cold<br />

weather NVP<br />

event unless<br />

there was<br />

already<br />

contamination<br />

present in the<br />

mine. Injury to<br />

worker related to<br />

industrial mining<br />

safety.<br />

C-60

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!