29.11.2014 Views

DOE 2000. - Waste Isolation Pilot Plant - U.S. Department of Energy

DOE 2000. - Waste Isolation Pilot Plant - U.S. Department of Energy

DOE 2000. - Waste Isolation Pilot Plant - U.S. Department of Energy

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

WIPP RH PSAR <strong>DOE</strong>/WIPP-03-3174 CHAPTER 8<br />

References for 8.4<br />

1. <strong>DOE</strong> Order 5480.19, Conduct <strong>of</strong> Operations Requirements for <strong>DOE</strong> Facilities.<br />

2. WP 04-CO, Conduct <strong>of</strong> Operations.<br />

3. WP 12-IS.01, Industrial Safety Program.<br />

4. WP 04-AD3011, Equipment Tagout/Lockout.<br />

5. WP 10-AD3005, Control and Use <strong>of</strong> Maintenance Locks.<br />

6. 29 CFR 1910.147, The Control <strong>of</strong> Hazardous <strong>Energy</strong> (Lockout/Tagout).<br />

7. WP 04-AD3008, Shift Operating Logs.<br />

8. WP 12-ES3918, Reporting Occurrences in Accordance with <strong>DOE</strong> Order 232.1A.<br />

9. WP 12-ER3904, Categorization and Classification <strong>of</strong> Operational Emergencies.<br />

10. WP 15-MD3102, Event Investigation.<br />

11. WP 13-QA3016, Root Cause Analysis.<br />

12. WP 12-9, WIPP Emergency Management Program.<br />

8.4-6 January 22, 2003

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!