29.11.2014 Views

DOE 2000. - Waste Isolation Pilot Plant - U.S. Department of Energy

DOE 2000. - Waste Isolation Pilot Plant - U.S. Department of Energy

DOE 2000. - Waste Isolation Pilot Plant - U.S. Department of Energy

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

WIPP RH PSAR <strong>DOE</strong>/WIPP-03-3174 CHAPTER 4<br />

FACILITY DESIGN AND OPERATION<br />

TABLE OF CONTENTS<br />

SECTION TITLE PAGE NO.<br />

4.3.8.1 72B RH TRU <strong>Waste</strong> Identification ............................. 4.3-9<br />

4.3.8.2 10-160B RH TRU <strong>Waste</strong> Identification ......................... 4.3-9<br />

4.3.9 Underground Mining Operations ...................................... 4.3-9<br />

4.3.9.1 Mining Method ............................................ 4.3-9<br />

4.3.9.2 Interface Between Mining and <strong>Waste</strong> Disposal Activities ........... 4.3-10<br />

4.3.9.3 Mined Material ........................................... 4.3-10<br />

4.3.9.4 Ground Control Program ................................... 4.3-10<br />

4.3.9.5 Geotechnical Monitoring ................................... 4.3-15<br />

References for Section 4.3 ................................................ 4.3-17<br />

4.4 Confinement Systems ..................................................... 4.4-1<br />

4.4.1 <strong>Waste</strong> Handling Building ............................................ 4.4-1<br />

4.4.2 Underground ..................................................... 4.4-2<br />

4.4.3 Ventilation Systems ............................................... 4.4-2<br />

4.4.3.1 Surface Ventilation Systems in Controlled Areas .................. 4.4-2<br />

4.4.3.1.1 RH TRU <strong>Waste</strong> Handling Area ...................... 4.4-4<br />

4.4.3.1.2 Mechanical Equipment Room ....................... 4.4-5<br />

4.4.3.1.3 <strong>Waste</strong> Handling Shaft Hoist Tower ................... 4.4-5<br />

4.4.3.1.4 Exhaust Filter Building ............................ 4.4-6<br />

4.4.3.2 Surface Support Structures Ventilation System .................... 4.4-6<br />

4.4.3.3 Subsurface Facilities Ventilation System ........................ 4.4-8<br />

4.4.3.3.1 Natural Ventilation Pressure ........................ 4.4-11<br />

4.4.3.3.2 Hot Weather NVP ............................... 4.4-11<br />

4.4.3.3.3 Cold Weather NVP .............................. 4.4-12<br />

References for Section 4.4 ................................................ 4.4-13<br />

4.5 Safety Support Systems ................................................... 4.5-1<br />

4.5.1 Fire Protection System .............................................. 4.5-1<br />

4.5.1.1 Fire Water Supply and Distribution System ...................... 4.5-2<br />

4.5.1.2 Fire Suppression System/Fire Detection and Alarm System .......... 4.5-2<br />

4.5.1.3 Radio Fire Alarm Reporter System ............................. 4.5-2<br />

4.5.1.4 Fire Protection System Design, Installation, Testing and Maintenance . . 4.5-3<br />

4.5.2 <strong>Plant</strong> Monitoring and Communications Systems ........................... 4.5-3<br />

4.5.2.1 Central Monitoring System ................................... 4.5-3<br />

4.5.2.2 <strong>Plant</strong> Communications ...................................... 4.5-4<br />

4.5.2.3 Radiation Monitoring System ................................. 4.5-5<br />

References for Section 4.5 ................................................. 4.5-6<br />

4.6 Utility and Auxiliary Systems ............................................... 4.6-1<br />

4.6.1 Electrical System .................................................. 4.6-1<br />

4.6.1.1 Normal Power Source ....................................... 4.6-1<br />

4.6.1.2 Backup Power Source ....................................... 4.6-2<br />

4.6.1.3 Uninterruptible Power Supply (Essential Loads) ................... 4.6-2<br />

4.6.1.4 Safety Considerations and Controls ............................ 4.6-3<br />

4.6.2 Compressed Air ................................................... 4.6-3<br />

4-ii January 28, 2003

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!