29.11.2014 Views

DOE 2000. - Waste Isolation Pilot Plant - U.S. Department of Energy

DOE 2000. - Waste Isolation Pilot Plant - U.S. Department of Energy

DOE 2000. - Waste Isolation Pilot Plant - U.S. Department of Energy

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

WIPP RH PSAR <strong>DOE</strong>/WIPP-03-3174 CHAPTER 5<br />

HAZARD AND ACCIDENT ANALYSIS<br />

TABLE OF CONTENTS<br />

SECTION TITLE PAGE NO.<br />

5.2.3.2 RH2 Fire in the WHB ...................................... 5.2-25<br />

5.2.3.3 RH3 Loss <strong>of</strong> Confinement in the WHB ......................... 5.2-26<br />

5.2.3.4 RH4-A Loss <strong>of</strong> Confinement in the Underground (<strong>Waste</strong> Hoist Failure)<br />

....................................................... 5.2-31<br />

5.2.3.5 RH4-B Loss <strong>of</strong> Confinement in the Underground (<strong>Waste</strong> Movement) . . 5.2-36<br />

5.2.3.6 RH5 Fire Followed by Explosion in the Underground ............. 5.2-39<br />

5.2.3.7 RH6 Seismic Event ....................................... 5.2-42<br />

5.2.3.8 RH7 Tornado Event ....................................... 5.2-45<br />

5.2.3.9 RH8 Aircraft ............................................. 5.2-47<br />

5.2.3.10 NC1 Fire in the Hot Cell .................................... 5.2-48<br />

5.2.3.11 NC2 Fire in the Underground ................................ 5.2-52<br />

5.2.3.12 NC3 Loss <strong>of</strong> Confinement in the WHB ......................... 5.2-53<br />

NC3-A Dropped Object on <strong>Waste</strong> Material in Hot Cell ............ 5.2-55<br />

NC3-B Dropped Object on <strong>Waste</strong> Material Outside Hot Cell ....... 5.2-57<br />

NC3-C Dropped Drum or Canister in Hot Cell .................. 5.2-58<br />

NC3-D Dropped Drum or Canister Outside Hot Cell .............. 5.2-60<br />

NC3-E Puncture <strong>of</strong> Drum in Hot Cell ......................... 5.2-61<br />

NC3-F Puncture <strong>of</strong> Drum or Canister Outside Hot Cell ............ 5.2-62<br />

NC3-G Puncture <strong>of</strong> 10-160B Cask in RH Bay ................... 5.2-64<br />

NC3-H Dropped 10-160B Cask in RH Bay ..................... 5.2-65<br />

NC3-I Toxic Gas Generation in Hot Cell ....................... 5.2-66<br />

5.2.3.13 NC4 Loss <strong>of</strong> Confinement in the Transfer Cell or Underground ...... 5.2-67<br />

5.2.3.14 NC5 Explosion Followed by Fire in the Hot Cell ................. 5.2-69<br />

5.2.3.15 NC6 Fire Followed by Explosion in the Underground ............. 5.2-70<br />

5.2.3.16 NC7 Seismic Event ....................................... 5.2-70<br />

5.2.3.17 NC8 Tornado Event ....................................... 5.2-73<br />

5.2.4 Assessment <strong>of</strong> WIPP RH Facility Design Basis and <strong>Waste</strong> Acceptance Criteria . . 5.2-74<br />

5.2.4.1 Assessment <strong>of</strong> WIPP RH Facility Design Basis .................. 5.2-74<br />

5.2.4.2 Analysis <strong>of</strong> Beyond the Design Basis Accidents .................. 5.2-81<br />

5.2.4.3 Assessment <strong>of</strong> WIPP <strong>Waste</strong> Acceptance Criteria (RH WAC) ....... 5.2-82<br />

References for Section 5.2 ................................................ 5.2-84<br />

5.3 Long-Term <strong>Waste</strong> <strong>Isolation</strong> Assessment ....................................... 5.3-1<br />

References for Section 5.3 ................................................. 5.3-2<br />

5.4 Conclusions ............................................................ 5.4-1<br />

5-ii January 22, 2003

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!