29.11.2014 Views

DOE 2000. - Waste Isolation Pilot Plant - U.S. Department of Energy

DOE 2000. - Waste Isolation Pilot Plant - U.S. Department of Energy

DOE 2000. - Waste Isolation Pilot Plant - U.S. Department of Energy

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

WIPP RH PSAR <strong>DOE</strong>/WIPP-03-3174 CHAPTER 8<br />

Table 8.3-1, WIPP Preoperational Checkout Program<br />

Test Title <strong>Plant</strong> Condition Test Objectives<br />

RH TRU <strong>Waste</strong> Handling<br />

System<br />

Before receiving RH TRU<br />

<strong>Waste</strong><br />

Verify all systems associated<br />

with the RH TRU waste<br />

disposal function as described<br />

in Section 4.3.2.<br />

8.3-7 January 22, 2003

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!