WIPP RH PSAR <strong>DOE</strong>/WIPP-03-3174 CHAPTER 5<br />

Table 5.1-9 Specific Accidents Selected for Quantitative Analysis<br />

72-B Cask<br />

Grouped Event Description<br />

Individual Events Included (Study<br />

Node and Event<br />

1) Fire Underground (RH1) 9-7, 10-2<br />

2) Fire in the WHB (RH2) 7-10<br />

3) Loss <strong>of</strong> confinement (LOC) in the WHB (RH3) 7-1, 7-2, 7-6<br />

4) LOC Underground (waste hoist failure) (RH4-A) 8-4, 8-6<br />

5)LOC Underground (waste movement) (RH4-B) 9-5, 10-1,10-5, 10-6<br />

6) Fire followed by Explosion Underground (RH5) 9-8, 10-3<br />

7) Seismic Event (RH6) 13-1<br />

8) Tornado Event (RH7) 13-2<br />

9) Aircraft Crash (RH8)<br />

10-160B Cask<br />

Grouped Event Description<br />

Individual Events Included (Study<br />

Node and Event<br />

1) Fire in Hot Cell (NC1 9-1, 11D-1<br />

2) Fire Underground (NC2) Same as RH1 (9-7, 10-2)<br />

3) LOC in WHB (NC3) 1B-6, 4D-1, 4F-1, 4G-1, 4H-1, 5BD-1,<br />

5CE-1, 5CE-2, 9-5, 9AC-1, 10A-1,<br />

10B-1, 10BF-1, 11D-3, 11F-1, 12E-1,<br />

12E-2, 12E-3, 12E-4, 14B-1<br />

4) LOC Transfer Cell & Underground (NC4) 13ABCD-1 & 14ACDEFGHI-1 same as<br />

RH3;<br />

15ABC-1 same as RH4-A;<br />

16ABCD-1 & 17ABCD-1 same as<br />

RH4-B<br />

5) Explosion followed by Fire in Hot Cell (NC5) 9-2, 11D-2<br />

6) Fire Followed by an Explosion Underground (NC6) Same as RH5 (9-8, 10-3)<br />

7) Seismic Event (NC7) 20-1, 20-2<br />

8) Tornado Event (NC8) 20-3<br />

5.1-34 January 22, 2003