29.11.2014 Views

DOE 2000. - Waste Isolation Pilot Plant - U.S. Department of Energy

DOE 2000. - Waste Isolation Pilot Plant - U.S. Department of Energy

DOE 2000. - Waste Isolation Pilot Plant - U.S. Department of Energy

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

WIPP RH PSAR <strong>DOE</strong>/WIPP-03-3174 APPENDIX C<br />

Table 1- 72B HAZOP Table<br />

Study Node<br />

Event No.<br />

Deviation Causes Consequences Existing Safeguards Actions or<br />

Recommendations<br />

Total Rank<br />

(Cons.,Freq )<br />

Radiological Rank<br />

(Cons.,Freq)<br />

Comments<br />

7 - 13 Unwanted<br />

motion -<br />

Facility cask<br />

transfer car<br />

moves while<br />

rotating<br />

Facility Cask<br />

Human Error;<br />

Mechanical<br />

Failure<br />

Potential<br />

equipment<br />

damage<br />

Motion interlocks;<br />

Equipment handler training;<br />

Operating procedures for<br />

Facility cask handling;<br />

NAI NA NA No release <strong>of</strong><br />

radioactive<br />

material<br />

8 - Facility cask loaded onto conveyance<br />

8 -1 Facility cask<br />

transfer car<br />

moved while<br />

turntable<br />

misaligned<br />

(movement at<br />

incorrect time)<br />

Human Error<br />

Equipment<br />

Failure<br />

Potential<br />

equipment<br />

damage -<br />

turntable, facility<br />

cask transfer car;<br />

Potential for<br />

process downtime<br />

Mechanical design <strong>of</strong> transfer<br />

car;<br />

Limited speed;<br />

Operator Training;<br />

Transfer car movement<br />

procedures;<br />

Pre-operational checks;<br />

Preventive Maintenance<br />

Program<br />

NAI NA NA No release <strong>of</strong><br />

radioactive<br />

material<br />

8 - 2 Cask loading<br />

room door<br />

damaged from<br />

impact <strong>of</strong><br />

facility cask<br />

transfer car<br />

Human Error;<br />

Equipment<br />

Failure - Facility<br />

cask drive<br />

mechanism<br />

Potential delay <strong>of</strong><br />

process;<br />

Potential for<br />

considerable<br />

damage to facility;<br />

Potential to lose<br />

differential<br />

pressure in some<br />

areas <strong>of</strong> facility;<br />

Potential for air<br />

flow reversal<br />

Operator Training/Procedures;<br />

Preventive Maintenance<br />

Program<br />

NAI 1,4 Facility Worker -<br />

1,4<br />

Onsite Worker - 1,4<br />

Offsite - 1,4<br />

Minimal<br />

radiological<br />

hazard could<br />

exist as the result<br />

<strong>of</strong> the air flow<br />

reversal if there<br />

is contamination<br />

present in the<br />

facility<br />

8 - 3 Incorrect<br />

conveyance<br />

position -<br />

Conveyance<br />

misalignment<br />

at the collar<br />

slab<br />

Control Loop<br />

Failure;<br />

Equipment<br />

failure<br />

Inability to load<br />

facility cask car<br />

onto conveyance;<br />

Potential for<br />

damage to pivot<br />

rails;<br />

Minor equipment<br />

damage<br />

Pre-operational checks;<br />

Preventive Maintenance<br />

Program;<br />

Equipment design;<br />

Equipment Inspection<br />

program<br />

NAI NA NA No release <strong>of</strong><br />

radioactive<br />

material<br />

C-16 January 23, 2003

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!