29.11.2014 Views

DOE 2000. - Waste Isolation Pilot Plant - U.S. Department of Energy

DOE 2000. - Waste Isolation Pilot Plant - U.S. Department of Energy

DOE 2000. - Waste Isolation Pilot Plant - U.S. Department of Energy

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

WIPP RH PSAR <strong>DOE</strong>/WIPP-03-3174 APPENDIX C<br />

Table 1- 72B HAZOP Table<br />

Study Node<br />

Event No.<br />

Deviation Causes Consequences Existing Safeguards Actions or<br />

Recommendations<br />

Total Rank<br />

(Cons.,Freq )<br />

Radiological Rank<br />

(Cons.,Freq)<br />

Comments<br />

13-2 Tornado<br />

(Design Basis<br />

Tornado)<br />

Tornado<br />

Potential for<br />

disruption <strong>of</strong><br />

processing<br />

operations;<br />

Potential to lose<br />

site utilities;<br />

Potential for<br />

worker injury or<br />

fatality;<br />

Potential for fire;<br />

Potential for<br />

explosion<br />

<strong>Waste</strong> Handling Building<br />

designed to withstand<br />

tornados;<br />

Emergency response<br />

procedures;<br />

Recovery Plan;<br />

Weather monitored by CMR<br />

(Central Monitoring Room);<br />

Road cask design - meets DOT<br />

Type B shipping container<br />

certification requirements;<br />

NAI 4,4 NA Worker injury or<br />

fatality could<br />

occur as the<br />

result <strong>of</strong> the<br />

tornado.<br />

13-3 Loss <strong>of</strong> Facility<br />

ventilation<br />

Human Error-<br />

Improper<br />

bulkhead<br />

alignment<br />

Equipment<br />

Failure -Failure<br />

<strong>of</strong> exhaust fans;<br />

Loss <strong>of</strong> electrical<br />

power;<br />

Loss <strong>of</strong><br />

compressed air<br />

Potential to<br />

shutdown<br />

operations<br />

Worker training; Ventilation<br />

system operating procedures;<br />

Preventive Maintenance<br />

Program for ventilation system<br />

equipment;<br />

Redundant Exhaust fans;<br />

Evacuation plan;<br />

Backup diesel generators;<br />

Redundant air compressors<br />

NAI NA NA No release <strong>of</strong><br />

radiological<br />

materials<br />

13-4 Loss <strong>of</strong> power NPH -<br />

Earthquake,<br />

tornado,<br />

lightning, high<br />

winds, etc.;<br />

Vehicle impact;<br />

Power from<br />

commercial<br />

supplier is lost<br />

Potential loss <strong>of</strong><br />

filtered<br />

ventilation;<br />

Potential loss <strong>of</strong><br />

hoist<br />

Backup diesel generators;<br />

Redundant power feeds;<br />

Response procedures; Worker<br />

training<br />

NAI NA NA No release <strong>of</strong><br />

radiological<br />

materials<br />

C-26 January 23, 2003

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!