29.11.2014 Views

DOE 2000. - Waste Isolation Pilot Plant - U.S. Department of Energy

DOE 2000. - Waste Isolation Pilot Plant - U.S. Department of Energy

DOE 2000. - Waste Isolation Pilot Plant - U.S. Department of Energy

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

WIPP RH PSAR <strong>DOE</strong>/WIPP-03-3174 CHAPTER 4<br />

References for Section 4.3<br />

1. <strong>DOE</strong>/WIPP-Draft 7-3123, Remote-Handled <strong>Waste</strong> Acceptance Criteria for the <strong>Waste</strong> <strong>Isolation</strong> <strong>Pilot</strong><br />

<strong>Plant</strong>.<br />

2. WP 08-WA.06, WIPP <strong>Waste</strong> Information System S<strong>of</strong>tware Requirements Specification<br />

3. WP 04-AU1007, Underground Openings Inspections.<br />

4. 30 CFR 57, Safety and Health Standards - Underground Metal and Nonmetal Mines, 8th edition,<br />

1994.<br />

5. WIPP/WID 96-2180, Long-Term Ground Control Plan for the <strong>Waste</strong> <strong>Isolation</strong> <strong>Pilot</strong> <strong>Plant</strong>.<br />

4.3-17 January 28, 2003

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!