29.11.2014 Views

DOE 2000. - Waste Isolation Pilot Plant - U.S. Department of Energy

DOE 2000. - Waste Isolation Pilot Plant - U.S. Department of Energy

DOE 2000. - Waste Isolation Pilot Plant - U.S. Department of Energy

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

WIPP RH PSAR <strong>DOE</strong>/WIPP-03-3174 CHAPTER 5<br />

Table 5.1-8 Summary <strong>of</strong> Hazardous Events Selected for Quantitative Analysis Page 1 <strong>of</strong> 2<br />

72-B Cask<br />

Major Concern<br />

Moderate Concern<br />

Study Node/Event Deviation Study Node/Event Deviation<br />

7-1 Shuttle moves while crane<br />

is lifting canister<br />

7-2 Canister dropped while<br />

being lifted into facility<br />

cask<br />

7-6 Shield valves (2) close on<br />

canister<br />

10-5 Shield valve on<br />

emplacement equipment is<br />

closed on canister<br />

10-6 Mis-alignment <strong>of</strong> canister<br />

as it is moved into<br />

borehole<br />

13-1 Seismic Event (Design<br />

Basis Earthquake)<br />

7-10 Hydraulic fluid fire 13-2 Tornado (Design Basis<br />

Tornado)<br />

8-4 Conveyance positioned at<br />

station, facility cask<br />

dropped into shaft<br />

8-6 Loss <strong>of</strong> brakes on<br />

conveyance while loaded<br />

with facility cask -<br />

conveyance drops to<br />

bottom <strong>of</strong> waste shaft<br />

9-5 Forklift drops facility cask<br />

9-7 Diesel fire on forklift<br />

9-8 Diesel fire followed by an<br />

explosion<br />

10-1 Loss <strong>of</strong> control - Forklift<br />

drops facility cask onto<br />

emplacement equipment<br />

10-2 Hydraulic fluid/diesel fuel<br />

fire<br />

10-3 Hydraulic/diesel fuel fire<br />

followed by an explosion<br />

5.1-32 January 22, 2003

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!