29.11.2014 Views

DOE 2000. - Waste Isolation Pilot Plant - U.S. Department of Energy

DOE 2000. - Waste Isolation Pilot Plant - U.S. Department of Energy

DOE 2000. - Waste Isolation Pilot Plant - U.S. Department of Energy

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

WIPP RH PSAR <strong>DOE</strong>/WIPP-03-3174 CHAPTER 5<br />

Table 5.1-1<br />

Hazard<br />

Type<br />

Maximum Hazardous Material Inventory by Facility Location<br />

Material<br />

Form<br />

Location<br />

(Facility Process)<br />

Inventory<br />

Number <strong>of</strong><br />

Canisters<br />

WASTE HANDLING BUILDING (72-B Cask)<br />

Basis for Number <strong>of</strong><br />

Canisters<br />

Radioactive/Nonradioactive<br />

Material<br />

RH TRU<br />

<strong>Waste</strong><br />

RH Bay 2 2 72B casks processed at a<br />

time 1<br />

Transfer Cell 1 1 road cask processed at a<br />

time<br />

Facility Cask<br />

Loading<br />

Room<br />

1 1 facility cask processed at<br />

a time<br />

UNDERGROUND HORIZON (72-B Cask)<br />

Radioactive/Nonradioactive<br />

Material<br />

RH TRU<br />

<strong>Waste</strong><br />

<strong>Waste</strong> Shaft Station 1 1 Facility cask processed<br />

at a time<br />

Disposal panel 730 Total waste capacity/panel<br />

WASTE HANDLING BUILDING (10-160B Cask)<br />

Radioactive/Nonradioactive<br />

Material<br />

RH TRU<br />

<strong>Waste</strong><br />

RH Bay 20 drums 2 10-160B casks processed<br />

at a time 1<br />

Hot Cell<br />

6 loaded canisters<br />

+ 10 drums = 28<br />

drums<br />

Transfer Cell 1 1 facility canister processed<br />

at a time<br />

Facility Cask<br />

Loading<br />

Room<br />

1 1 facility cask processed at<br />

a time<br />

UNDERGROUND HORIZON (10-160B Cask)<br />

Radioactive/<br />

Non-radioactive<br />

Material<br />

RH TRU<br />

<strong>Waste</strong><br />

<strong>Waste</strong> Shaft Station 1 1 Facility cask processed<br />

at a time<br />

Disposal panel 730 Total waste capacity/panel<br />

Notes:<br />

1. Any combination <strong>of</strong> two 10-160B and 72-B casks can be processed in the RH Bay <strong>of</strong> the WHB.<br />

5.1-25 January 22, 2003

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!