29.11.2014 Views

DOE 2000. - Waste Isolation Pilot Plant - U.S. Department of Energy

DOE 2000. - Waste Isolation Pilot Plant - U.S. Department of Energy

DOE 2000. - Waste Isolation Pilot Plant - U.S. Department of Energy

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

WIPP RH PSAR <strong>DOE</strong>/WIPP-03-3174 APPENDIX C<br />

Table 2- 10-160B HAZOP Table<br />

Study Node<br />

Event No.<br />

Deviation Causes Consequences Existing Safeguards Actions Total Rank<br />

(Cons., Freq)<br />

Radiological Rank<br />

(Cons.,Freq)<br />

Comments<br />

11. Prepare WIPP Canister for Disposal<br />

11D-1 Fire in the Hot<br />

Cell<br />

Heat generated<br />

by welding<br />

causes ignition<br />

<strong>of</strong> combustibles<br />

inside canister<br />

Potential for<br />

onsite/<strong>of</strong>fsite<br />

consequences;<br />

Potential for<br />

spread <strong>of</strong><br />

contamination;<br />

Potential for<br />

facility damage;<br />

Potential for<br />

equipment<br />

damage.<br />

Robotic welder design;<br />

WAC (no flammable material);<br />

(i.e.: two mechanical failures<br />

to cause accident);<br />

Storage limits on waste (LFL);<br />

Lid design;<br />

WIPP Canister design;<br />

Training and procedures;<br />

Ventilation;<br />

Fire Loading/ Combustible<br />

Control Program;<br />

Thermal detector;<br />

Shield door closed in the CUR;<br />

Shield plug in Hot Cell is in<br />

place.<br />

NAI 4,4 Facility Worker -<br />

2,4<br />

Onsite Worker - 4,4<br />

Offsite - 4,4<br />

Radiological<br />

Hazard Only<br />

11D-2 Explosion in<br />

the Hot Cell<br />

Ignition <strong>of</strong><br />

flammable gases<br />

in canister head<br />

space during<br />

welding<br />

activities<br />

Potential for drum<br />

breach;<br />

Potential for<br />

damage to Hot<br />

Cell; Potential for<br />

loss <strong>of</strong> shielding<br />

to facility worker;<br />

Potential for<br />

onsite/<strong>of</strong>fsite<br />

consequences;<br />

Potential for<br />

worker fatality;<br />

Potential for<br />

spread <strong>of</strong><br />

contamination.<br />

Limited storage time in the Hot<br />

Cell; Training and Procedures;<br />

Canister lid design; Preventive<br />

Maintenance Program on<br />

welder; WAC (no flammable<br />

material); Vented drums and<br />

canister; Ventilation;<br />

Shield door closed in the CUR;<br />

Shield plug in Hot Cell is in<br />

place.<br />

NAI 4,4 Facility Worker -<br />

4,4<br />

Onsite Worker - 4,4<br />

Offsite - 4,4<br />

C-52

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!