29.11.2014 Views

DOE 2000. - Waste Isolation Pilot Plant - U.S. Department of Energy

DOE 2000. - Waste Isolation Pilot Plant - U.S. Department of Energy

DOE 2000. - Waste Isolation Pilot Plant - U.S. Department of Energy

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

WIPP RH PSAR <strong>DOE</strong>/WIPP-03-3174 CHAPTER 1<br />

These controls will be designed to ensure that the repository functions as designed, and the potential for<br />

future, inadvertent human intrusion is reduced to a level that renders such intrusion unlikely.<br />

This Preliminary Safety Analysis Report (PSAR) documents the safety analyses that develop and<br />

evaluate the adequacy <strong>of</strong> the WIPP RH TRU safety basis necessary to ensure the safety <strong>of</strong> workers, the<br />

public, and the environment from the hazards posed by WIPP waste handling and emplacement<br />

operations during the disposal phase and hazards associated with the decommissioning and<br />

decontamination phase.<br />

The analyses <strong>of</strong> the hazards associated with the long-term (10,000 year) disposal <strong>of</strong> TRU and TRU mixed<br />

waste, and demonstration <strong>of</strong> compliance with the requirements <strong>of</strong> 40 CFR 191, Subpart B 4 have been<br />

addressed in detail in the WIPP Compliance Certification Application (CCA). 8 The EPA reviewed the<br />

CCA and subsequently certified that the WIPP was in compliance with the requirements in 40 CFR 191,<br />

Subpart B and C on May 13, 1998. 9 SAR Section 5.3, Long-Term <strong>Waste</strong> <strong>Isolation</strong> Assessment<br />

summarizes the assessment.<br />

1.1-2 January 24, 2003

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!