WIPP RH PSAR <strong>DOE</strong>/WIPP-03-3174 CHAPTER 4<br />

Table 4.6-1 Diesel Generator Load<br />

Manually Switched Backup<br />

Loads kW Remarks<br />

Uninterruptible Power System*<br />

Central Monitoring System*<br />

WHB Continuous Air Monitors*<br />

Central Monitoring Room<br />

HVAC System<br />

Utilities<br />

Fire Protection Systems in the<br />

<strong>Waste</strong> Handling Building<br />

Support Building<br />

72<br />

20<br />

30 Battery power is provided in fire<br />

protection system until the diesel<br />

generator is started and loaded.<br />

Fire Pump 160<br />

Communications Systems 16<br />

Guard & Security Building 35<br />

Air Intake Shaft Hoist (If necessary for U/G<br />

evacuation)*<br />

330 The diesel generators load is<br />

reduced to 900 kW prior to<br />

operating the AIS hoist.<br />

WHB Lighting 45<br />

WHB Cranes 80 After the diesel generator is<br />

started cranes are energized as<br />

required to land their loads.<br />

WHB Vacuum Pumps 50<br />

Main Air Compressors (1-200 hp)* 160<br />

U/G Exhaust Fans (1-235 hp)* 188<br />

<strong>Waste</strong> Handling Building Fans* 100<br />

U/G Sandia other Experimental Loads 400<br />

Safety & Emergency Services Building<br />

(EOC)*<br />

10<br />

* Priority Back-up loads. Other loads picked up depending on actual kW loading <strong>of</strong> diesel or by<br />

load shedding.<br />

4.6-9 January 28, 2003