29.11.2014 Views

DOE 2000. - Waste Isolation Pilot Plant - U.S. Department of Energy

DOE 2000. - Waste Isolation Pilot Plant - U.S. Department of Energy

DOE 2000. - Waste Isolation Pilot Plant - U.S. Department of Energy

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

WIPP RH PSAR <strong>DOE</strong>/WIPP-03-3174 CHAPTER 1<br />

Table 1.3-1<br />

MEI Risk Evaluation Guidelines<br />

Description<br />

Estimated Annual<br />

Frequency <strong>of</strong><br />

Occurrence<br />

Description<br />

Radiological<br />

Guidelines<br />

Nonradiological<br />

Guidelines<br />

Normal<br />

operations<br />

1 $ f >10 -1<br />

Anticipated 10 -1 $ f $ 10 -2 Incidents that may occur<br />

several times during the<br />

lifetime <strong>of</strong> the facility.<br />

(Incidents that commonly<br />

occur)<br />

Unlikely 10 -2 $ f > 10 -4 Accidents that are not<br />

anticipated to occur during<br />

the lifetime <strong>of</strong> the facility.<br />

Natural phenomena <strong>of</strong> this<br />

class include: Uniform<br />

Building Code-level<br />

earthquake, 100-year flood,<br />

maximum wind gust, etc.<br />

# 2.5 rem<br />

(25 mSv)<br />

# 6.5 rem<br />

(65 mSv)<br />

ERPG-1<br />

ERPG-1<br />

Extremely<br />

Unlikely<br />

10 -4 $f > 10 -6 Accidents that will probably<br />

not occur during the life<br />

cycle <strong>of</strong> the facility.<br />

# 25 rem<br />

(250 mSv)<br />

ERPG-2<br />

Beyond<br />

Extremely<br />

Unlikely<br />

10 -6 $ f All other accidents. No Guidelines No Guidelines<br />

1.3-24 January 24, 2003

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!