WIPP RH PSAR <strong>DOE</strong>/WIPP-03-3174 APPENDIX C<br />

Table 1- 72B HAZOP Table<br />

Study Node<br />

Event No.<br />

Deviation Causes Consequences Existing Safeguards Actions or<br />

Recommendations<br />

Total Rank<br />

(Cons.,Freq )<br />

Radiological Rank<br />

(Cons.,Freq)<br />

Comments<br />

6 - 5 Incorrect<br />

position <strong>of</strong><br />

shield valves (<br />

valves close<br />

sooner than<br />

desired)<br />

Equipment<br />

Failure;<br />

Control Loop<br />

Failure-PLC<br />

(Programmable<br />

Logic<br />

Controller)<br />

Potential damage<br />

to cask;<br />

Potential damage<br />

to crane ropes;<br />

Potential damage<br />

to floor valve;<br />

Hoist interlock;<br />

Cask design<br />

NAI NA NA No release <strong>of</strong><br />

radioactive<br />

material<br />

7 - Load canister into facility cask<br />

7 - 1 Excessive<br />

movement -<br />

Shuttle moves<br />

while crane is<br />

lifting canister<br />

Mechanical<br />

Failure;<br />

Control Loop<br />

Failure<br />

Potential for<br />

damage to shuttle;<br />

Potential breach<br />

<strong>of</strong> the canister;<br />

Potential spread <strong>of</strong><br />

contamination;<br />

Potential for direct<br />

radiological<br />

exposure to<br />

personnel;<br />

Potential for<br />

worker injury or<br />

fatality.<br />

Grapple hoist interlock;<br />

Limited access into Transfer<br />

Cell;<br />

Pre-operational checks;<br />

Preventive Maintenance<br />

Program for shuttle and<br />

control equipment;<br />

<strong>Waste</strong> handling procedures;<br />

RH area ventilation system -<br />

HEPA (High Efficiency<br />

Particulate Air) filtration<br />

R-11 Review<br />

canister and shuttle<br />

car designs and<br />

control loop design<br />

to ensure potential<br />

for inadvertent<br />

movement is<br />

addressed<br />

4,4 Facility Worker -<br />

4,4<br />

Onsite Worker - 4,4<br />

Offsite - 4,4<br />

Worker injury or<br />

fatality could<br />

result from the<br />

industrial<br />

accident.<br />

Potential for<br />

radiological<br />

impact to<br />

facility, and to<br />

receptors onsite<br />

including in<br />

facility and<br />

<strong>of</strong>fsite.<br />

7 - 2 Canister is<br />

dropped while<br />

being lifted<br />

into facility<br />

cask; canister<br />

falls back into<br />

road cask or<br />

onto transfer<br />

room floor<br />

Human Error;<br />

Equipment<br />

Failure - Crane,<br />

grapple;<br />

Control Loop<br />

Failure;<br />

Potential breach<br />

<strong>of</strong> canister;<br />

Potential spread <strong>of</strong><br />

contamination;<br />

Potential for<br />

significant<br />

damage to facility;<br />

Potential for<br />

considerable<br />

consequences to<br />

<strong>of</strong>fsite<br />

individuals;<br />

Potential for<br />

significant process<br />

downtime for<br />

recovery;<br />

Potential for<br />

worker injury or<br />

fatality.<br />

HEPA filtration;<br />

<strong>Waste</strong> handling and crane<br />

operation procedures;<br />

Operator training;<br />

Weight interlock on grapple;<br />

Shielding for workers; Impact<br />

limiter on canister;<br />

Pre-operational checks for<br />

crane and control equipment;<br />

Preventive Maintenance<br />

Program for crane equipment<br />

and control equipment;<br />

Limited access into transfer<br />

cell<br />

4,4 Facility Worker -<br />

4,4<br />

Onsite Worker - 4,4<br />

Offsite - 4,4<br />

Worker injury or<br />

fatality could<br />

result from the<br />

industrial<br />

accident.<br />

Potential for<br />

radiological<br />

impact to <strong>of</strong>fsite<br />

C-12 January 23, 2003