WIPP RH PSAR <strong>DOE</strong>/WIPP-03-3174 APPENDIX C<br />

Table 2- 10-160B HAZOP Table<br />

Study Node<br />

Event No.<br />

Deviation Causes Consequences Existing Safeguards Actions Total Rank<br />

(Cons., Freq)<br />

Radiological Rank<br />

(Cons.,Freq)<br />

Comments<br />

11D-3 Halogenated<br />

hydrocarbons<br />

accumulate in<br />

WIPP Canister<br />

head space and<br />

welding<br />

activity<br />

produces<br />

phosgene gas<br />

(toxic) in the<br />

Hot Cell<br />

Chemical<br />

reaction to<br />

ultraviolet light<br />

Potential onsite<br />

exposure to toxic<br />

gas.<br />

Ventilation system dilutes;<br />

Training and procedures;<br />

Canister design;<br />

WAC.<br />

A-9) Verify<br />

requirements about<br />

allowable levels <strong>of</strong><br />

halogenated<br />

hydrocarbons in the<br />

drum.<br />

A-10) Verify the<br />

hazardous chemical<br />

inventory in the<br />

waste.<br />

3,4 NA Ventilation flow<br />

rate will dilute<br />

the gas.<br />

Requires further<br />

Accident<br />

Analysis<br />

11F-1 Loaded WIPP<br />

Canister<br />

dropped in the<br />

Hot Cell<br />

Canister lid<br />

failure;<br />

Grapple failure;<br />

Welding failure;<br />

Human error;<br />

Shear crane<br />

cables<br />

Potential for<br />

breach <strong>of</strong> canister;<br />

Potential for<br />

breach <strong>of</strong> drums;<br />

Potential for<br />

facility damage;<br />

Potential for<br />

onsite/<strong>of</strong>fsite<br />

consequences;<br />

Potential for<br />

spread <strong>of</strong><br />

contamination;<br />

Potential for<br />

facility worker<br />

exposure<br />

Grapple design;<br />

Preventive Maintenance<br />

Program on crane;<br />

Training and procedures<br />

(welding);<br />

Canister design;<br />

Lid design;<br />

Robotic welder design;<br />

Shield door closed in the CUR;<br />

Shield plug in Hot Cell is in<br />

place.<br />

NAI 4,4 Facility Worker -<br />

1,4<br />

Onsite Worker - 4,4<br />

Offsite - 4,4<br />

Radiological<br />

Hazard Only<br />

12. WIPP Canister Transfer to Shuttle Car in Transfer Cell<br />

12D-1 Loaded WIPP<br />

Canister<br />

dropped in the<br />

Hot Cell<br />

Same as event<br />

11F-1<br />

NAI<br />

C-53