24.12.2014 Views

SCT Banner Financial Aid / Release Guide / 7.0

SCT Banner Financial Aid / Release Guide / 7.0

SCT Banner Financial Aid / Release Guide / 7.0

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Section 28 Multi-Award Year Perkins MPN - Functional<br />

Changed Processes and Reports<br />

from the Satisfied Date (RRRAREQ_SATISFIED_DATE) and the Date of the First<br />

Disbursement for MPN (RRRAREQ_MPN_FIRST_DISB_DATE) updated with<br />

the RPRAWRD_PAID_DATE.<br />

If Perkins MPN Expiration Date (RRRAREQ_PERK_MPN_EXP_DATE) is not after<br />

the earliest Disbursement Date for the Perkins fund<br />

(RPRADSB_SCHEDULE_DATE), the following error message displays: **ERROR<br />

** Student required to complete Perkins MPN.<br />

The Perkins MPN Expiration Date will be updated at the time of Disbursement<br />

(payment), because making a loan represents the first disbursement for loan funds.<br />

If no disbursements are made within 12 months after the borrower signs the MPN,<br />

the Perkins MPN is not valid for subsequent disbursements (Inactive).<br />

The Perkins MPN expires on the earliest of these dates:<br />

• The date the school receives from the borrower written notice that no further<br />

loans may be made under the MPN;<br />

• Twelve months after the date the borrower signs the MPN, if no disbursements<br />

are made under the MPN; or<br />

• Ten years after the date the borrower signs the MPN or the date the school<br />

receives the MPN.<br />

• Disbursement Amount is backed out to zero.<br />

If the MPN First Disbursement Date (RRRAREQ_MPN_FIRST_DISB_DATE) is within<br />

the current aid year (ROBINST_AIDY_START_DATE and ROBINST_AIDY_END_DATE),<br />

and the Total Paid Amount (RPRAWRD_PAID_AMT) is backed out to zero, then the<br />

MPN First Disbursement Date is updated to null, and the Expiration Date<br />

(RRRAREQ_PERK_MPN_EXP_DATE) is set to 12 months from the Satisfied Date<br />

(RRRAREQ_SATISFIED_DATE).<br />

Batch Posting Process (RORBPST)<br />

Modifications to this process include:<br />

• Adding Logic When the Satisfied Status is Updated.<br />

The process when updating Satisfied Status (RRRAREQ_SAT_IND) now has<br />

additional Multi-Award Years Perkins MPN processing. This is only required<br />

for Institutions using this MPN and Tracking Requirements identified<br />

designated as Perkins MPN.<br />

If no disbursements have been made under this promissory note (that is,<br />

RRRAREQ_MPN_FIRST_DISB_DATE is null), when the Satisfied Indicator<br />

(RRRAREQ_SAT_IND) is Yes , the following are updated:<br />

• Satisfied Date (RRRAREQ_SATISFIED_DATE), with the Requirement<br />

Status Date (RRRAREQ_STAT_DATE), and<br />

• Expiration Date (RRRAREQ_PERK_MPN_EXP_DATE) to one year from<br />

Satisfied Date (RRRAREQ_SATISFIED_DATE).<br />

January 2005 <strong>Financial</strong> <strong>Aid</strong> <strong>Release</strong> <strong>7.0</strong><br />

Confidential <strong>Release</strong> <strong>Guide</strong> 363

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!