09.07.2015 Views

Complete Document - City of Auburn

Complete Document - City of Auburn

Complete Document - City of Auburn

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>City</strong> CouncilLong Range Goals1. <strong>Complete</strong> the construction <strong>of</strong> the Soccer Complexon Wire Road so that play can begin by the end <strong>of</strong>FY 03.2. <strong>Complete</strong> the construction <strong>of</strong> Town Creek Park,Phase 1 by the end <strong>of</strong> FY 03 and <strong>of</strong> Phase 2 by theend <strong>of</strong> FY 08.3. Build the new cemetery on South Gay Street by theend <strong>of</strong> FY 03.4. Finish the construction <strong>of</strong> the clay court TennisCenter on Richland Road by the end <strong>of</strong> FY 03,contingent upon enrollment <strong>of</strong> a sufficient number<strong>of</strong> individuals willing to commit to paying an annualmembership fee to generate enough membershiprevenue to pay the debt service on the debt issuedto finance construction <strong>of</strong> the Tennis Center.5. <strong>Complete</strong> the Land Use Plan, have the PlanningCommission and <strong>City</strong> Council study it, and adopt itby the end <strong>of</strong> FY 03.6. Open the Work Training Center in cooperation witharea industry and the Industrial Development Boardin Industrial Park #1 by the end <strong>of</strong> FY 03.7. Upgrade the treatment capacity at the H. C. Morganwastewater treatment facility to 9 MGD by the end<strong>of</strong> FY 04 and close the Northside wastewatertreatment plant to remove nutrients and improvewater quality in Saugahatchee Creek by the end <strong>of</strong>FY 05.8. Install the major sewer line extensions andreplacements approved in FY 02 by the end <strong>of</strong> FY04.9. Construct a new headquarters facility for the Waterand Sewer Department on Shug Jordan Parkwayby the end <strong>of</strong> FY 04.10. Work to ensure that the State <strong>of</strong> Alabama widensthe bridge over the Interstate on South CollegeStreet and extends the road improvements fromShell Toomer Parkway to Beehive Road by the end<strong>of</strong> FY 04.11. Participate with the State <strong>of</strong> Alabama in the street,drainage, and sidewalk improvements to DonahueDrive from Magnolia Avenue to Bragg Avenue bythe end <strong>of</strong> FY 04 and from Bragg Avenue to BedellAvenue by the end <strong>of</strong> FY 06.12. Expand Frank Brown Recreation Center to includea teen center by the end <strong>of</strong> FY 04; build a seniorcenter/therapeutics center by the end <strong>of</strong> FY 05; andconstruct Phase 2 <strong>of</strong> the Jan Dempsey Arts Centerby the end <strong>of</strong> FY 06.13. Continue the <strong>City</strong>’s commitment through grantfunding and local funding to the construction <strong>of</strong>sidewalks, bikeways, and greenways as shown inthe Capital Improvements Program over the nextsix years.14. Work to ensure that the State <strong>of</strong> Alabamacompletes the installation <strong>of</strong> a new Interstateinterchange near Beehive Road by the end <strong>of</strong> FY 06.15. Purchase the property for the <strong>Auburn</strong> TechnologyPark West by the end <strong>of</strong> FY 03 and construct theneeded improvements so that the Park can be openby the end <strong>of</strong> FY 06.16. Acquire the right <strong>of</strong> way and develop the plans for themissing segments <strong>of</strong> the Outer Loop Road by the end<strong>of</strong> FY 05 and construct the roadway and install otherimprovements by the end <strong>of</strong> FY 06.17. Participate in the local funding for the installation <strong>of</strong>safety landing equipment and construction <strong>of</strong> a newterminal at the <strong>Auburn</strong>-Opelika Airport by the end <strong>of</strong>FY 04.18. Finalize agreements with the Sheriff, the Lee CountyCommission, and the <strong>City</strong> <strong>of</strong> Opelika to build additionaljail space at the Lee County Detention Center by theend <strong>of</strong> FY 03 and construct the needed improvementsby the end <strong>of</strong> FY 05.19. Facilitate with private developers the construction <strong>of</strong>Major Street Plan projects: Longleaf Drive extensionto Cox Road and the Samford Avenue extension toEast Glenn Avenue by the end <strong>of</strong> FY 04; VeteransBoulevard from Sarah Drive to South College Streetby the end <strong>of</strong> FY 04; North Dean Road from EastUniversity Drive to South College Street by the end <strong>of</strong>FY 07; and others listed in the Capital ImprovementsProgram.20. Purchase a new ladder truck for the fire service by theend <strong>of</strong> FY 03 and begin construction <strong>of</strong> fire station # 5in the South College Street area by the end <strong>of</strong> FY 04.21. <strong>Complete</strong> the improvements and extensions to thesewer system shown on the Master Sewer Plan andlisted in the Capital Improvements Program by theend <strong>of</strong> FY 08.22. Fund the second phase <strong>of</strong> the Duck Samford youthbaseball-s<strong>of</strong>tball complex during FY 05 and completeconstruction by the end <strong>of</strong> FY 06.114

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!