09.07.2015 Views

Complete Document - City of Auburn

Complete Document - City of Auburn

Complete Document - City of Auburn

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Water and Sewer DepartmentRex Griffin, DirectorMajor Functions <strong>of</strong> the Water and Sewer Department♦ Maintain approximately 180 miles <strong>of</strong> sewerlines, 4000 manholes, 11,000 service lines,five pumping stations, and 80 miles <strong>of</strong>easements♦ Respond to approximately 400 service callseach year, inspect all grease traps twiceeach year, dig and repair approximately 50line segments each year♦ Work with new developments on the reviewand approval <strong>of</strong> water, sewer, and fireprotection systems♦ Work with the private contractor onwastewater treatment for the <strong>City</strong> <strong>of</strong> <strong>Auburn</strong>♦ Operate and maintain the water treatmentplant to produce adequate quantities <strong>of</strong> highquality water for the citizens <strong>of</strong> <strong>Auburn</strong>♦ Maintain good customer relations withapproximately 14,000 accounts♦ Operate and maintain a water distributionsystem consisting <strong>of</strong> approximately 200miles <strong>of</strong> water lines, 2000 fire hydrants, 6elevated tanks and over 14,000 meters♦ Manage a 32 square mile watershed and a260 acre water supply reservoir♦ Maintain the water system to support a class 2fire insurance rating♦ Provide customers with written summary eachyear <strong>of</strong> the test results, health effects, andother information about the water system♦ Maintain a master plan for both water andsewer improvements and financing to insureadequate capacity for the futureMajor Accomplishments in FY 02♦ <strong>Complete</strong>d the installation <strong>of</strong> an altitude controlvalve on the Shug Jordan water tank to improvewater pressure in higher elevation locations.♦ <strong>Complete</strong>d improvements to the watertreatment plant to increase capacity to 12million gallons per day.♦ <strong>Complete</strong>d and mailed the "consumerconfidence report” required by the federalEnvironmental Protection Agency.♦ <strong>Complete</strong>d the installation <strong>of</strong> a two milliongallon per day metering point near theintersection <strong>of</strong> US Highway 280 and FarmvilleRoad.♦ <strong>Complete</strong>d the Willow Creek Phase II sewerline. Project is under construction.Benchmarks Achieved in FY 02♦ Percentage <strong>of</strong> Biological Oxygen Demandremoved from wastewater treatment planteffluent: Northside plant-98%, Southsideplant-96%♦ Percentage <strong>of</strong> Total Suspended Solidsremoved from wastewater treatment plants’effluent: 97%♦ One main sewer line blockage per 5.71 miles♦ One sewer service blockage per 30.46customers♦ Average production <strong>of</strong> water treatment plantand purchase <strong>of</strong> finished water: 5.3 milliongallons per day♦ Average Threshold Odor Number in finishedwater: 0♦ Average operating level <strong>of</strong> chloride in finishedwater: 2.09 parts per million232

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!