09.07.2015 Views

Complete Document - City of Auburn

Complete Document - City of Auburn

Complete Document - City of Auburn

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Public Works DepartmentJeffery Ramsey, <strong>City</strong> Engineer andPublic Works DirectorThe mission <strong>of</strong> the Public Works Department is toprovide excellent construction and engineeringservices on <strong>City</strong>-related projects to all residents andfirms in a timely, efficient manner. Excellent serviceincludes appropriate service hours and a trained,courteous staff to provide timely, accurate, andappropriate information and assistance. We willachieve this by:• Constructing, installing, repairing, and maintainingthe <strong>City</strong>’s streets, sidewalks, bridges, and drainagestructures• Installing and maintaining proper traffic control andstreet name signs• Devising creative options and innovative solutionsto the <strong>City</strong> Manager to address municipalinfrastructure issues in the most cost-effectivemanner• Providing technical assistance and advice to the<strong>City</strong> Manager and Planning Commission on allengineering questions• Developing and maintaining an accurate mappingdatabase with a variety <strong>of</strong> information for the <strong>City</strong>and the public• Pursuing knowledge <strong>of</strong> the best availabletechnology and procedures relating to the field <strong>of</strong>engineeringFY 03 Goals1. Design/construct the new sidewalk on Dean Roadbetween Annalue Drive and Glenn Avenue by July31,2003.2. In conjunction with ALDOT, complete the roadwidening <strong>of</strong> North Donahue Drive betweenMagnolia and Bragg by September 30, 2003.3. Upgrade drainage pipes at the Burton House onMagnolia Avenue by June 30, 2003.4. Begin the Pumphrey Avenue Pipe ReplacementProject near Shug Jordan Parkway by June 30,2003.5. Evaluate the structural integrity <strong>of</strong> the DuckSamford Stadium and the downtown parking deckby June 30, 2003.6. Install decorative streetlights on Tichenor Avenueby June 30, 2003.7. <strong>Complete</strong> the Phase II Storm Water permitting withthe Alabama Department <strong>of</strong> EnvironmentalManagement by March 10, 2003.8. Replace and repair twenty old-style inlets bySeptember 30, 2003.9. Remove sediment at specific locations in Moore’s MillCreek to improve water quality by September 30, 2003.10. Monitor the water quality <strong>of</strong> Moore’s Mill Creek andParkerson Mill by September 30, 2003.11. <strong>Complete</strong> the 2003 Resurfacing Project by September30, 2003.12. <strong>Complete</strong> the traffic signal installation at East UniversityDrive and South Donahue Drive by September 30,2003.13. Pending funding from Transportation Enhancementgrant, design/construct the North College StreetSidewalk between Drake Avenue and Shelton MillRoad by September 30, 2003.14. Pending funding from Transportation Enhancementgrant, design/construct the Opelika Road SidewalkProject between East University Drive and CommerceDrive by September 30, 2003.FY 04 Goals1. Pending funding from Transportation Enhancementgrant, design/construct the Dumas Drive Sidewalkbetween Heard Avenue and Samford Avenue bySeptember 30, 2004.2. Pending funding from Transportation Enhancementgrant, design/construct the Woodfield Drive SidewalkProject between South College and Wright’s Mill Roadby September 30, 2004.3. Pending funding from Transportation Enhancementgrant, construct the Thach Avenue Bikeway Projectbetween Debardebeleben and Ross Street bySeptember 30, 2004.4. In conjunction with ALDOT, complete the road widening<strong>of</strong> North Donahue Drive between Bragg and Bedell bySeptember 30, 2004.5. <strong>Complete</strong> intersection improvements at the SamfordAve./Dean Road intersection by September 30, 2004.6. Design a new bridge on North Donahue Drive atSaugahatchee Creek by September 30, 2004.7. Remove sediment at specific locations in Moore’s MillCreek to improve water quality by September 30, 2004.8. Improve pedestrian crossings in the downtown area bySeptember 30, 2004.9. Replace and repair twenty old-style inlets bySeptember 30, 2004.10. Monitor the water quality <strong>of</strong> Moore’s Mill Creek andParkerson Mill Creek by September 30, 2004.11. <strong>Complete</strong> the 2004 Resurfacing Project by September30, 2004.12. <strong>Complete</strong> the traffic signal installation at the EastUniversity Drive/Wright’s Mill Road intersection bySeptember 30, 2004.172

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!