12.07.2015 Views

Environmental Statement volume 4 - Chiltern Evergreen3

Environmental Statement volume 4 - Chiltern Evergreen3

Environmental Statement volume 4 - Chiltern Evergreen3

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

(ii) For control of traffic leaving the site, “Give Way” signs as diagram 602,120mm high, and road markings as diagrams 1003 and 1023 shall be in place.A variant of diagram 565.2 station “Works Traffic Only” shall be mounted onthe reverse side of the ”Give Way” sign assemblies.B5.2.33The precise location of each sign shall be determined by the Contractor to thesatisfaction of the relevant Highway Authority.Lorry MovementsB5.2.34B5.2.35B5.2.36Those who may move large and/or heavy loads, construction plant, materials andspoil (including vehicles used for carrying such when running empty) shall limitthe use of public highways as far as is reasonably practicable.Routes will be identified and agreed with the highway authority in advance. HGVsarriving or leaving the site shall do so between 0700 and 1900 hours Monday toFriday or 0800 to 1300 on Saturday, unless otherwise agreed with the localauthority.All reasonable measures shall be taken to ensure that delivery vehicles do not parkon the highways prior to entering the site.ParkingB5.2.37B5.2.38B5.2.39Areas/locations of parking provision for site and construction traffic shall bedefined prior to the commencement of works.No daytime or overnight parking of site or construction vehicles outside anyconstruction compounds or work sites shall be allowed except where the delivery orremoval of materials is taking place at that location or with prior agreement withthe highway authority.Lorries waiting to enter or leave the site must switch off their engines to avoidunnecessary engine noise and emissions.Existing Street Furniture and TreesB5.2.40B5.2.41No street furniture or other features within the vicinity of the constructionworksites, but outside the area covered by the proposed Order, shall beunnecessarily disturbed or altered by the works. Any damage to street furniture asa consequence of construction activities connected with the scheme shall bereported to CRCL and the appropriate owner or authority (unless the appropriateowner cannot be identified) immediately on discovery of the damage. Any damageshall be replaced or made good as soon as practicably possible and to the reasonablesatisfaction of the owner of the street furniture or other feature.Any street furniture or other obstructions outside the area to be occupied but whichare required to be moved in order to gain access to the site shall be removed andreinstated/replaced as appropriate, on completion of the works, subject to the priorconsent of the owner (such consent not to be unreasonably withheld).ENVIRONMENTAL RESOURCES MANAGEMENTB-21CHILTERN RAILWAYS

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!