Table D3.2Plant Inventory Representing Underbridge Construction ActivitesPlant TeamsNumber of PlantRequired -FoundationsNumber of PlantRequired -SuperstructureBS: 5228ReferenceSWL(dBA)%OntimeEffectiveSWL (dBA)Total Effective SWL(dBA) -FoundationsHydraulic 0 1 C 4 35 95 25 89 0 89hoists/platformsExcavators (small) 1 1 C 4 17 99 100 99 99 99Lorries 1 1 C 2 34 108 5 95 95 95Total 101 101Total Effective SWL(dBA) -SuperstructureTable D3.3Plant Inventory Representing Road Overbridge Construction ActivitesPlant TeamsNumber of PlantRequired -FoundationsNumber of PlantRequired -SuperstructureBS: 5228ReferenceSWL(dBA)%OntimeEffectiveSWL (dBA)Total Effective SWL(dBA) -FoundationsExcavators (360°C) 1 1 C 2.14 107 100 107 107 107Dozers 1 1 C 2.11 107 50 104 104 104Hydraulic 0 1 C 4 35 95 25 89 89hoists/platformsLorries 1 1 C 2 34 108 5 95 95 95Total 109 109Total Effective SWL(dBA) -SuperstructureTable D3.4Plant Inventory Representing Embankment Construction Activites at the Bicester ChordPlant Teams Number of PlantRequired -FoundationsExcavators(360°)Number of PlantRequired -SuperstructureBS: 5228ReferenceSWL(dBA)% OntimeEffectiveSWL (dBA)Total Effective SWL(dBA) - Foundations2 1 C 2.14 107 50 104 107 104Lorries 2 1 C 2 34 108 5 95 98 95Hand tools 0 1 C 3 35 102 50 99 99Total 108 106Total Effective SWL(dBA) - SuperstructureENVIRONMENTAL RESOURCES MANAGEMENTCHILTERN RAILWAYSD-17

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!