12.07.2015 Views

Environmental Statement volume 4 - Chiltern Evergreen3

Environmental Statement volume 4 - Chiltern Evergreen3

Environmental Statement volume 4 - Chiltern Evergreen3

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Figure 62.7 AP6 – Elm Tree Farm/Langford Lane OverbridgeDue to the requirement to close the Langford Lane level crossing and replace farmcrossings to the south, a new road is proposed running from Elm Tree Farm,Wendlebury, to the existing Langford Lane at the hamlet of Bramlow. This will cross therailway 0.75 km east of Wendlebury, for which a new overbridge is to be built. Thelocation of the development is shown in Figure 7 (proposed new road shown in blue).The bridge and railway access route both lie largely in Flood Zone 3, as defined by theEA Flood Map, as do significant lengths of the proposed new road.11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!