Figure 42.5 AP4 – A41 OverbridgeThe railway is taken under the A41 trunk road at the southern edge of Bicester. Thetrack is to be lowered to accommodate W12+ gauge clearance for the resultingoverbridge. The bridge span is to be lengthened on the east side for a third siding track.It may be seen in Figure 5 that the site (orange marker and arrow) lies within FloodZone 3 according to the EA Flood Map; the A41 crosses the image generally from west toeast, the railway generally from north to south. The same uncertainty is present withregards to the EA Flood Map as described for AP3.9