Figure 162.17 AP16 – Wolvercot Tunnel and First Turn OverbridgeThe tracks through the tunnel and overbridge at First Turn are to be lowered. TheWolvercot Tunnel approaches and the tunnel itself will need internal retaining structures.The bridge will be underpinned and strengthened. The location of works is shown inFigure 17, and it can be seen that the First Turn Overbridge site (orange marker andarrow) lies within Flood Zone 1, as defined by the Oxford City SFRA; the same is true forthe Wolvercot Tunnel (green marker and arrow)21