12.07.2015 Views

Environmental Statement volume 4 - Chiltern Evergreen3

Environmental Statement volume 4 - Chiltern Evergreen3

Environmental Statement volume 4 - Chiltern Evergreen3

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

NMILLSTREAM VIADUCT RECONSTRUCTIONSRIVER CHERWELL VIADUCT RECONSTRUCTIONSINEW WATER EATON PARKWAY STATIONHJKARISTOTLE LANE FOOTBRIDGETO BE RETAINEDOXFORD STATION -DISUSED PARCEL BAYS AT NORTHEND EXTENDED AND CONVERTEDFOR PASSENGER USELKey:Likely Maximum Construction VehiclesBased on Ordnance Survey Map with the permissionof the Controller of Her Majesty’s Stationery Office.Crown Copyright PFA ConsultingLicence No. AL1000000540 1kmStrategy:Routes taken back to M40 by route considered to haveleast effort on residential properties.Bulk earthworks will be transported by rail wherepossible to limit construction related road access.Any removal of material from site by road will beplanned to avoid the highway peak hours.10-12 per hour6-10 per hour3-6 per hourGenerally movements will be considerably lower.Note:Locations identified as A - L relate to Table 11.24Stratton Park HouseWanborough RoadSwindonSN3 4HGT 01793 828000F 01793 835500E admin@pfaplc.comW www.pfaplc.comClient<strong>Chiltern</strong> RailwaysProjectFigure Title<strong>Chiltern</strong> Railways(Bicester to Oxford Improvements)Proposed ConstructionVehicle Routeing Plan(Islip to Oxford)Figure NoAnnex I4bDate September 2009Drawn By ENChecked By ESScale See Scale BarFile Ref E094/Figs/0909/Annex_I4b.aiDrg No E094

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!