12.07.2015 Views

Environmental Statement volume 4 - Chiltern Evergreen3

Environmental Statement volume 4 - Chiltern Evergreen3

Environmental Statement volume 4 - Chiltern Evergreen3

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Figure 102.11 AP10 – Oddington OverbridgeA new overbridge and associated diversion of the existing roads are planned for thelocation shown in Figure 11, at Oddington Crossing, east of Barndon Farm. This replacesthe existing level crossing on an unclassified road which is to be closed due to theincreased line speed on the railway. The structure will comprise reinforced earthabutments with wingwalls. Existing trackside drainage ditches at the edges of the railwayembankment will be locally diverted through circular precast concrete culvert sections.Figure 11 shows that the development site is entirely within Flood Zone 1 according tothe EA Flood Map.15

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!