13.07.2015 Views

Bruno Latour, Aramis, or the Love of Technology, PDF - Dss-edit.com

Bruno Latour, Aramis, or the Love of Technology, PDF - Dss-edit.com

Bruno Latour, Aramis, or the Love of Technology, PDF - Dss-edit.com

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

[THE SAME DOCUMENT, CONTINUED]IV .2.2.1. Functional Observations*IV .2.2 . 1 . 1 . General Framew<strong>or</strong>kThe verifications <strong>of</strong> <strong>the</strong> functional and technologicalstatus <strong>of</strong> <strong>the</strong> equipment at <strong>the</strong> time <strong>the</strong> experiment was terminatedtook place from Monday, November 23, 1987, to Tuesday,December 1, 1987, inclusive (8:30 A.M.-5 :00 P.M. weekdays) . Of<strong>the</strong>se seven consecutive w<strong>or</strong>king days, two were neutralizedso as to allow Matra Transp<strong>or</strong>t to get <strong>the</strong> PI vehicle to functionas anticipated; de spite this additional delay and <strong>the</strong>initial postponement <strong>of</strong> <strong>the</strong> starting date f<strong>or</strong> <strong>the</strong> trialsfrom November 2 to November 23, <strong>the</strong> PI pair <strong>of</strong> cars was unableto participate in <strong>the</strong> trials . . .The verifications to be carried out by <strong>the</strong> representatives <strong>of</strong> <strong>the</strong> RATP were de fined by Matra Transp<strong>or</strong>t ,which prepared documents f<strong>or</strong> this purpose describing <strong>the</strong> anticipatedtrials wi thin <strong>the</strong> framew<strong>or</strong>k <strong>of</strong> <strong>the</strong> cod:'ci 1. Thereare fifteen <strong>of</strong> <strong>the</strong>se "statements." Each one in fact c<strong>or</strong>respondsto a reduction <strong>of</strong> <strong>the</strong> PVRI-<strong>the</strong> minutes <strong>of</strong> acceptancetrials f<strong>or</strong> proving <strong>com</strong>pliance with <strong>the</strong> specifications set(cahier d'essais de proces-verbaux de recette individuelle]. The PVRI , having be<strong>com</strong>e statements by reduction,were thus insufficient to "qualify" <strong>the</strong> functions <strong>or</strong> <strong>the</strong>subsystem . . .IV.2.2.1.3. ResultsThe verification log intended to rec<strong>or</strong>d <strong>the</strong> conditions <strong>of</strong><strong>the</strong> trial is a transcript <strong>of</strong> notes taken on that occasion . Itdescribes in chronological <strong>or</strong>der <strong>the</strong> unanticipated incidentsthat occurred during <strong>the</strong> verifications . .Without claiming to deduce from <strong>the</strong>se figures anythingo<strong>the</strong>r than trends, let us note that <strong>the</strong> average t:'me betweenincidents was approximately ten minutes .*In <strong>the</strong> framew<strong>or</strong>k <strong>of</strong> a contract, <strong>the</strong> contracting auth<strong>or</strong>ity [maitre d'ouvraBeJ isrequired to provide legal verification that <strong>the</strong> <strong>com</strong>mitments made by <strong>the</strong> contract<strong>or</strong>{maitre J'oeuHc] have been carried out. Receipt and homologation are two steps in <strong>the</strong>process <strong>of</strong> legislating <strong>the</strong> technological capabilities <strong>of</strong> a transp<strong>or</strong>tation system. Verificationis ac<strong>com</strong>plished by contradict<strong>or</strong>y procedures that have to be approved hy hothparties.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!