13.07.2015 Views

Bruno Latour, Aramis, or the Love of Technology, PDF - Dss-edit.com

Bruno Latour, Aramis, or the Love of Technology, PDF - Dss-edit.com

Bruno Latour, Aramis, or the Love of Technology, PDF - Dss-edit.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

"Acc<strong>or</strong>ding to <strong>the</strong> notes," I said, "among <strong>the</strong> 'act<strong>or</strong>s' we ought tointerview is Cohen, who's a graduate <strong>of</strong> Supacro; he's a satellitespecialist hired by Matra as production head. His classmate Freque wasselected to keep tabs on VAL. What's VA L?""It's <strong>the</strong> automated metro in Lille. Everybody keeps bringing itup when we talk about <strong>Aramis</strong>; we 're going to have to look into it, too.Especially because Matra built it. It was begun around <strong>the</strong> same time,and <strong>the</strong> same engineers w<strong>or</strong>ked on both projects."I sighed when I thought <strong>of</strong> all <strong>the</strong> interviews we had to do.Funny-I'd chosen sociology thinking it would be less w<strong>or</strong>k than <strong>the</strong>Ecole's o<strong>the</strong>r internships, like man-machine interactions <strong>or</strong> signal analy­SIS."Then <strong>the</strong>re's Lamoureux, fresh out <strong>of</strong> <strong>the</strong> Ecole Poly techniqueand Tele<strong>com</strong>-just like me, if I may say so-with no preconceivednotions about <strong>the</strong> w<strong>or</strong>ld <strong>of</strong> public transp<strong>or</strong>tation, again just like me.The RATP picked him to w<strong>or</strong>k on <strong>the</strong> project. Matra hired M. Guyot,one <strong>of</strong> Bardet's engineers-he's a specialist in machine transfers- tohead its future transp<strong>or</strong>tation branch.""What about Bardet?""Apparently he kept one foot in <strong>the</strong> project as technical adviser.Not one <strong>of</strong> those engineers had any background in transp<strong>or</strong>tation. AsI understand it, <strong>the</strong>y all said to <strong>the</strong>mselves: 'If we can build satellites,we can surely build a subway. " ,"But that's an advantage, too. They were ready to reinvent <strong>the</strong>wheel if <strong>the</strong>y had to. Now <strong>com</strong>es <strong>the</strong> tricky part, my friend. We needto move on from easy sociology to hard sociology. It's our turn t<strong>or</strong>einvent <strong>the</strong> wheel. And <strong>the</strong>re's only one way to go about it: we haveto dig into <strong>the</strong> documents."[OOCUMENT: INRETS REPORT, APRIL 13, 1972]Article 2; Composi tion <strong>of</strong> <strong>the</strong> PrototypeThe prototype will consist <strong>of</strong> :-a segment <strong>of</strong> track 800 to 1, 000 meters long, a fixed statonrepresented by a platf<strong>or</strong>m, and a movable s tation thatwill facilitate inexpensive simulations <strong>of</strong> various uses : aEASIBlf2-------- ---

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!