Safeguard Catalogue - Communications Remarks<br />

____________________________________________________________________ .........................................<br />

S 6.1 Development of a survey of availability<br />

requirements<br />

Initiation responsibility: Head of <strong>IT</strong> Section, <strong>IT</strong> Security Management<br />

Implementation responsibility: Staff responsible for the individual <strong>IT</strong><br />

applications<br />

<strong>The</strong> availability requirements are to be identified for the <strong>IT</strong> applications run on<br />

an <strong>IT</strong> system and for their data. Since an <strong>IT</strong> application does not necessarily<br />

require each element of the <strong>IT</strong> system, the availability requirements of <strong>IT</strong><br />

applications are to be mapped onto the essential components of the given <strong>IT</strong><br />

system. <strong>The</strong> result of this activity can be represented in the form of a survey<br />

covering the following:<br />

<strong>IT</strong>-System <strong>IT</strong> component <strong>IT</strong> procedure tolerable<br />

down-time<br />

central system host travel allowance 5 man-days<br />

(Reading: <strong>The</strong> <strong>IT</strong> component "host" in the <strong>IT</strong> system "central system" has a<br />

maximum tolerable down-time of "3 hours" due to the "accounting".)<br />

A practicable approach is to ask the procedures officer about the tolerable<br />

down-times of the used <strong>IT</strong> components with regard to the various <strong>IT</strong><br />

applications, in order to list the results by <strong>IT</strong> system and component in the<br />

table.<br />

Such a survey makes it easier to extract those components of the <strong>IT</strong> system<br />

which are particularly time-critical and for which contingency planning is<br />

indispensable. In addition, this survey provides information about the affected<br />

<strong>IT</strong> applications and their availability requirements in case of the failure of any<br />

one of the components.<br />

<strong>The</strong> users and/or customer departments/specialised divisions must provide the<br />

rationale for such availability requirements. This must be done at this stage<br />

____________________________________________________________________ .........................................<br />

<strong>IT</strong>-<strong>Baseline</strong> <strong>Protection</strong> <strong>Manual</strong>: Oktober 2000<br />

accounting 3 hours<br />

data transmission E-Mail 3 man-days<br />

accounting 1 man-day<br />

printer travel allowance 10 man-days<br />

accounting 2 man-days<br />

applications<br />

planning<br />

1 man-day<br />

LAN Servers data acquisition 1 man-day<br />

control station 4 hours<br />

PC data acquisition 10 man-days<br />

PC control station 4 hours