Safeguard Catalogue Infrastucture Remarks<br />

____________________________________________________________________ .........................................<br />

S 1.3 Adapted segmentation of circuits<br />

Initiation responsibility: Head of <strong>Site</strong>/Bldg Technical Service<br />

Implementation responsibility: <strong>Site</strong>/Bldg Technical Service<br />

Experience shows that room allocation and the power ratings, for which an<br />

electric installation has been laid out, will, after some time, no longer match<br />

the actual situation. Thus, it is essential to review, and, where appropriate, to<br />

adjust the electric installation when rooms are to be used for different<br />

purposes and when changes and amendments are made to the technical<br />

equipment (<strong>IT</strong>, air-conditioning, lighting). This may be done by re-wiring<br />

lines. Otherwise, it may become necessary to re-install feeders, lines,<br />

distributors, etc.<br />

Additional controls:<br />

- Are any checks made to see whether the protection and layout of circuits<br />

meet the actual requirements?<br />

- When was the last check made?<br />

____________________________________________________________________ .........................................<br />

<strong>IT</strong>-<strong>Baseline</strong> <strong>Protection</strong> <strong>Manual</strong>: Oktober 2000

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!