19.12.2012 Views

IT Baseline Protection Manual - The Information Warfare Site

IT Baseline Protection Manual - The Information Warfare Site

IT Baseline Protection Manual - The Information Warfare Site

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>IT</strong> <strong>Baseline</strong> <strong>Protection</strong> of Generic Components<br />

_________________________________________________________________________________________<br />

b) = one-off personnel expense<br />

c) = recurring investment cost<br />

d) = recurring personnel expense<br />

<strong>The</strong> implementation plan resulting from Management’s decisions regarding the above table is now<br />

drawn up in tabular form.<br />

Target<br />

object<br />

Entire<br />

organisation<br />

Server room R<br />

3.10<br />

Mo<br />

dule<br />

_________________________________________________________________________________________<br />

<strong>IT</strong>-<strong>Baseline</strong> <strong>Protection</strong> <strong>Manual</strong>: Otober 2000<br />

Implementation plan (as of 30 September 2000)<br />

Safeguard Impleme<br />

nt by<br />

3.1 S 2.11 Provisions Governing<br />

the Use of Passwords<br />

4.3.2 A1 Installation of metal<br />

sheets to take water away,<br />

with monitoring via a water<br />

alarming device which alerts<br />

the porter.<br />

Server S4 6.5 S 1.28 Local Uninterruptible<br />

Power Supply<br />

C1 group of<br />

clients<br />

...<br />

5.5 A2 Smart card-supported<br />

authentication plus local<br />

encryption of hard disks<br />

Person<br />

responsi<br />

ble<br />

31/12/00 a) A.<br />

Müller<br />

b) P. Meier<br />

30.04.2001 a) C.<br />

Schmitz<br />

b) F.<br />

Hofmann<br />

31.10.2000 a) C.<br />

Schulz<br />

b) P. Meier<br />

31.12.2000 a) C.<br />

Schulz<br />

b) P. Meier<br />

Key:<br />

- Responsibilities:<br />

a) = Responsible for implementation of the safeguard<br />

b) = Responsible for overseeing implementation<br />

- Budgetary framework: available for implementation of the safeguard<br />

a) = one-off investment cost<br />

b) = one-off personnel expense<br />

c) = recurring investment cost<br />

d) = recurring personnel expense<br />

Budgetary<br />

framework<br />

a) euro 0<br />

b) 2 working days<br />

c) euro 0 p.a.<br />

d) 0 working days<br />

p.a.<br />

a) euro 1,000<br />

b) 1 working day<br />

c) euro 0 p.a.<br />

d) 0 working days<br />

p.a.<br />

a) euro 500<br />

b) 1 working days<br />

c) euro 0 p.a.<br />

d) 0 working days<br />

p.a.<br />

a) euro 1,400<br />

b) 2 working days<br />

c) euro 0 p.a.<br />

d) 2 working days<br />

p.a.<br />

Notes<br />

Metal sheets<br />

only to be<br />

installed<br />

under pipes<br />

carrying<br />

fresh and<br />

wastewater.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!