19.12.2012 Views

IT Baseline Protection Manual - The Information Warfare Site

IT Baseline Protection Manual - The Information Warfare Site

IT Baseline Protection Manual - The Information Warfare Site

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Safeguard Catalogue - Communications Remarks<br />

____________________________________________________________________ .........................................<br />

S 6.14 Replacement procurement plan<br />

Initiation responsibility: Head of <strong>IT</strong> Section, <strong>IT</strong> Security Management<br />

Implementation responsibility: Administrator; staff responsible for the<br />

individual <strong>IT</strong> applications<br />

In case of the failure of parts of the <strong>IT</strong> system, in addition to repair,<br />

replacement procurement will initially be the most purposive measure to<br />

achieve restoration of availability.<br />

In order to expedite the replacement process, it is useful to establish a<br />

replacement procurement plan. For each major <strong>IT</strong> component, this plan must<br />

provide information on:<br />

- designation of the <strong>IT</strong> component (name, device number, date of<br />

procurement);<br />

- manufacturer;<br />

- supplier;<br />

- period of delivery; and<br />

- time required for re-installation.<br />

If several manufacturers or suppliers can be named for a given <strong>IT</strong> component,<br />

they are to be listed as alternatives. It may also be possible to include<br />

references to other products. In the replacement procurement process, such<br />

information is needed for economical resource management.<br />

In addition to restoring the availability of the <strong>IT</strong> system, advances in<br />

information technology must also be taken account of in the context of<br />

replacement measures. If used parts of the <strong>IT</strong> system no longer come up to the<br />

best available technology, a replacement procurement activity must not be<br />

aimed exclusively at restoring the status ante quo. For this purpose, the<br />

replacement procurement plan must be regularly revised. Attention must be<br />

paid to the interrelations with resources control (cf. S 2.2 Resources control).<br />

Additional controls:<br />

- At what intervals are revisions made of the replacement procurement plan?<br />

- In case of changes made to the <strong>IT</strong> system, will the replacement<br />

procurement plan be revised?<br />

____________________________________________________________________ .........................................<br />

<strong>IT</strong>-<strong>Baseline</strong> <strong>Protection</strong> <strong>Manual</strong>: Oktober 2000

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!