COMFLTFORCOMINST 4790.3 REV A CH-1<br />

r. (Nuclear Powered Ships only) Provide sufficient time for crew training and Fast Cruise during the<br />

building period to permit Ship's Force to attain a state of training adequate to ensure proper operation<br />

and safety of the ship and its personnel during Sea Trials. Provide sufficient time for the correction of<br />

deficiencies after the completion of the final Dock Trials and before the start of the operational training<br />

period.<br />

s. (Nuclear Powered Ships only) Submit for approval the schedule and sequence of any dockside tests or<br />

Sea Trials involving operation of the nuclear propulsion plant to NAVSEA 08, except where such tests<br />

and trials have been approved in the written instructions provided by NAVSEA 08.<br />

t. (Submarines only) Coordinate with ISIC for support personnel to perform salvage inspection.<br />

u. (Nuclear Powered Ships only) Submit the schedule and sequence of all Sea Trials to the ISIC for<br />

approval and to the TYCOM for concurrence with the operational aspects of the trial.<br />

v. (Nuclear Powered Ships only) Report to the Ship Program Manager when the ship is ready for Fast<br />

Cruise and Alpha Sea Trial (Builder's Trials for Nuclear Powered Aircraft Carriers). Appendix B of<br />

this chapter provides a sample message.<br />

w. (Nuclear Powered Ships only) Report the successful completion of Fast Cruise and readiness for Alpha<br />

Sea Trial (Builder's Trials for Nuclear Powered Aircraft Carriers), with the concurrence of the OIC, to<br />

the TYCOM, with an information copy to the Ship Program Manager, the Fleet Commander and the<br />

ISIC. Appendix B of this chapter provides a sample message for submarines.<br />

x. (Nuclear Powered Ships only) Report to the Ship Program Manager the satisfactory completion of<br />

Alpha Sea Trials (Builder's Trials for Nuclear Powered Aircraft Carriers). For Submarines, the material<br />

status of the ship is certified to support operations to test depth. Appendix C of this chapter provides a<br />

sample message.<br />

y. (Submarines only) Certify to the Ship Program Manager the completion of all Sea Trials, reporting the<br />

status of all Sea Trial deficiencies and all CAT 1A Audit Items. Certify the material condition of the<br />

ship is satisfactory for URO to test depth. Appendix D of this chapter provides a sample message.<br />

z. Retain responsibility for the material condition of the ship until it reports for duty in the fleet.<br />

aa. Maintain "Lessons Learned Logs" from the CO of previously built ship for delivery to the next<br />

PCO/OIC.<br />

ab. (Applicable Submarines only) Report by message to NAVSEA Submarine Program Manager, in<br />

advance of the scheduled start of Fast Cruise, that all FBW SCS work necessary for Alpha Sea Trials,<br />

including resolution of NAVSEA FBW SCS Certification Audit Category I recommendations, has been<br />

completed, provide the status of all incomplete NAVSEA FBW SCS Certification Audit Category IA<br />

recommendations, and that the FBW SCS is ready for commencement of Fast Cruise. The message<br />

shall also state that there are no conditional FBW SCS Deviations or Waivers which have not been<br />

satisfied or cite those that exist, identify any operating restrictions of the ship and/or system, and that,<br />

subject to satisfactory completion of Fast Cruise and resolution of mandatory FBW SCS deficiencies,<br />

the submarine FBW SCS is satisfactory for commencement of sea trials. Make a similar report prior to<br />

each subsequent sea trial. Appendix W of this chapter provides a sample message.<br />

ac. (Applicable Submarines only) Report by message to the NAVSEA Submarine Program Manager and<br />

TYCOM, with the concurrence of the ship's Commanding Officer, successful completion of Fast Cruise<br />

as a prerequisite for the start of sea trials. Appendix X of this chapter provides a sample message.<br />

I-2-9