05.02.2013 Views

JOINT FLEET MAINTENANCE MANUAL

JOINT FLEET MAINTENANCE MANUAL

JOINT FLEET MAINTENANCE MANUAL

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

APPENDIX E<br />

COMFLTFORCOMINST 4790.3 REV A CH-3<br />

SAMPLE SUPERVISING AUTHORITY MESSAGE<br />

TO SHIP PROGRAM MANAGER AND TYCOM CONCERNING PSA<br />

FAST CRUISE/SEA TRIAL READINESS (SUBMARINES)<br />

FM (SUPERVISING AUTHORITY)//<br />

TO COMNAVSEASYSCOM WASHINGTON DC//(SHIP PROGRAM MANAGER)/08/07Q//<br />

(TYCOM)//N43//<br />

INFO CNO WASHINGTON DC//N77//<br />

(<strong>FLEET</strong> COMMANDER)//N43//<br />

(PARENT GROUP)//N4//<br />

(PARENT SQUADRON)//<br />

USS (SHIP NAME)//<br />

BT<br />

UNCLAS //N09094//<br />

MSGID/GENADMIN/(SUPERVISING AUTHORITY)//<br />

SUBJ: (SUBS) READINESS FOR FAST CRUISE AND SEA TRIAL OF (SHIP NAME AND HULL NO.)//<br />

REF/A/DOC/NAVSEA 0924-LP-062-0010//<br />

AMPN/REF A IS SUBMARINE SAFETY (SUBSAFE) REQUIREMENTS <strong>MANUAL</strong>//<br />

REF/B/DOC/OPNAVINST 9080.3//<br />

AMPN/REF B IS PROCEDURES FOR TESTS AND TRIALS OF NAVAL NUCLEAR POWERED SHIPS<br />

UNDER CONSTRUCTION, MODERNIZATION, CONVERSION, REFUELING AND OVERHAUL//<br />

REF/C/LTR/(ORIGINATING ACTIVITY) (SERIAL NUMBER)/(DATE)//<br />

AMPN/REF C IS COMNAVSEASYSCOM LETTER CONCERNING NAVSEA SUBSAFE CERTIFICATION<br />

AUDIT REPORT//<br />

RMKS/1. IAW REFS A AND B, (SUPERVISING AUTHORITY) CERTIFIES THE MATERIAL CONDITION<br />

OF THOSE PARTS OF (SHIP NAME AND HULL NO.) INSTALLED, REPAIRED AND/OR TESTED BY THE<br />

SHIPYARD SATISFACTORY FOR POST REPAIR SEA TRIALS.<br />

2. IAW REF A, (SUPERVISING AUTHORITY) REPORTS THAT ALL CAT I AUDIT RECOMMENDATIONS<br />

OF REF C HAVE BEEN SATISFACTORILY RESOLVED. THERE ARE NO SUBSAFE DEVIATIONS AND<br />

WAIVERS WITH CONDITIONS WHICH HAVE NOT BEEN SATISFIED.(OR LIST CONDITIONAL<br />

DEVIATIONS AND WAIVERS.)<br />

3. IAW REF A, THE STATUS OF INCOMPLETE CAT IA AUDIT RECOMMENDATIONS OF REF C IS AS<br />

FOLLOWS:<br />

A.<br />

B.<br />

4. (SUPERVISING AUTHORITY) REPORTS READINESS OF USS (SHIP NAME AND HULL NO.) FOR<br />

COMMENCEMENT OF FAST CRUISE. CO USS (SHIP NAME AND HULL NO.) CONCURS.<br />

5. SUBJECT TO SATISFACTORY COMPLETION OF FAST CRUISE AND RESOLUTION OF MANDATORY<br />

DEFICIENCIES (SUPERVISING AUTHORITY) CONSIDERS USS (SHIP NAME AND HULL NO.)<br />

MATERIAL CONDITION READINESS SATISFACTORY FOR COMMENCEMENT OF SEA TRIALS.//<br />

BT<br />

NOTE: ENSURE MESSAGES ARE IN ACCORDANCE WITH NTP-3 FORMAT AND CURRENT<br />

PLAD IS UTILIZED.<br />

I-2E-1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!