COMFLTFORCOMINST 4790.3 REV A CH-5<br />

(3) Communicate with escort at each 100 feet depth increment or at 10 minute intervals,<br />

whichever is sooner. If communications are lost, return to depth at which communications can<br />

be reestablished before continuing. (see Note 7).<br />

k. At depths listed for hull valve cycling in reference (i) (as applicable) per NAVSEA approved Deep<br />

Dive Test Form:<br />

(1) Check accuracy of gages and repeaters.<br />

(2) Conduct operational test of signal ejectors. (see Note 8).<br />

(3) Check shaft bearings and stern tubes for excessive heating, leakage and noise. Sealol shaft<br />

seals must be tested at each depth and for the required time, as specified in the approved class<br />

test form.<br />

(4) Cycle rudder and planes through full throw to check for binding. (see Note 9).<br />

(5) Operate all hull and back-up valves (using remote closures, as applicable, from flooding<br />

control stations) of seawater systems required to maintain propulsion and other functions vital<br />

to the ship's operation at increments of depth specified in reference (i). Required systems are<br />

listed in paragraph 4.b. of reference (i). Observe restrictions on operation of systems listed in<br />

paragraph 4.d. of reference (i).<br />

(6) Check operation of bulkhead flappers and watertight doors for binding.<br />

(7) Operate trim and drain pumps, discharging to sea.<br />

(8) Cycle components of each torpedo tube. Check for leakage. Establish integrity of torpedo<br />

tubes by admitting sea pressure through equalizing lines or flooding connection before cycling<br />

components (see Notes 3, 8 and 16).<br />

(9) Vent negative tank inboard (if installed). (see Notes 3 and 10).<br />

(10) Cycle main vents to check for binding.<br />

l. At maximum authorized operating depth:<br />

(1) Repeat item 2.k.(1) of this appendix - Depth gages and repeaters.<br />

(2) Operate each signal ejector by impulse and hand, as applicable. (see Notes 3 and 8).<br />

(3) Repeat item 2.k.(3) of this appendix - Shafting and bearings.<br />

(4) Repeat item 2.k.(5) of this appendix - Hull and back-up valves.<br />

(5) Repeat item 2.k.(6) of this appendix - Bulkhead flappers and watertight doors.<br />

(6) Repeat item 2.k.(7) of this appendix - Trim and drain pumps.<br />

(7) Repeat item 2.k.(8) of this appendix - Torpedo tubes. (see Notes 3 and 16).<br />

(8) Repeat item 2.k.(9) of this appendix - Negative tank (if applicable).<br />