COMFLTFORCOMINST 4790.3 REV A CH-3<br />

APPENDIX H1<br />

SAMPLE SUPERVISING AUTHORITY TO NAVSEA MESSAGE<br />

REQUESTING AUTHORIZATION FOR CRITICALITY<br />

FM (SUPERVISING AUTHORITY)//<br />

TO COMNAVSEASYSCOM WASHINGTON DC//08//<br />

INFO CNO WASHINGTON DC//N77//<br />

(SHIP PROGRAM MANAGER)//<br />

(<strong>FLEET</strong> COMMANDER)//N43//<br />

(TYCOM)//N43/N9 (FOR CVN)//<br />

(ISIC)//<br />

(PARENT GROUP)//N4//<br />

(PARENT SQUADRON)//<br />

PRECOMUNIT (SHIP NAME)//<br />

BT<br />

UNCLAS NOFORN//N09690//<br />

MSGID/GENADMIN/(SUPERVISING AUTHORITY)//<br />

SUBJ/(SHIP NAME AND HULL NO.) INITIAL CRITICALITY OF REACTOR PLANT NR TWO//<br />

REF/A/DOC/NAVSEA 0989-028-5000//<br />

AMPN/REF A IS <strong>MANUAL</strong> FOR THE CONTROL OF THE TESTING AND PLANT CONDITIONS//<br />

REF B/DOC/OPNAVINST 9080.3//<br />

AMPN/REF B IS PROCEDURES FOR TESTS AND TRIALS OF NAVAL NUCLEAR POWERED SHIPS<br />

UNDER CONSTRUCTION, MODERNIZATION, CONVERSION, REFUELING, AND OVERHAUL//<br />

REF/C/LTR/(ORIGINATING ACTIVITY) (SERIAL NUMBER)/(DATE)//<br />

AMPN/REF C IS NAVSEA 08 LETTER IDENTIFYING CORE INSTALLED IN (SHIP NAME)//<br />

REF/D/DOC/A4W/A1G PREREQ LIST NR SEVEN REV D DTD 6 MAY 86//<br />

AMPN/REF D IS A4W/A1G PREREQUISITE LIST NUMBER SEVEN//<br />

REF/E/LTR/(ORIGINATING ACTIVITY) (SERIAL NUMBER)/(DATE)//<br />

AMPN/REF E IS NAVSEA PROGRAM MANAGER LETTER CONCERNING RESOLUTION TO<br />

OUTSTANDING WORK ITEMS//<br />

REF/F/LTR/(ORIGINATING ACTIVITY) (SERIAL NUMBER)/(DATE)//<br />

AMPN/REF F IS SUPERVISING AUTHORITY LETTER CONCERNING RESOLUTION TO OUTSTANDING<br />

WORK ITEMS//<br />

RMKS/1. IAW REFS A AND B, REQ AUTHORIZATION TO PERFORM TEST PROCEDURE<br />

A4W/A1G 3-KA-9 REV D DTD 5-6-86 IN REACTOR PLANT NR TWO.<br />

2. THE REACTOR CORE IS INSTALLED IN (SHIP NAME) REACTOR NR TWO AS SPECIFIED BY REF C.<br />

3. (SHIPBUILDER) HAS CERTIFIED THAT ALL PREREQS FOR NR TWO PLANT INITIAL CRITICALITY<br />

REQD BY REF D ARE MET.<br />

4. THE PCO, (SHIP NAME) AND NRRO CONCUR THAT THE NUCLEAR PROPULSION PLANT NR TWO<br />

IS READY FOR INITIAL CRITICALITY AND SUBSEQUENT POWER RANGE TESTING.<br />

5. ALL OUTSTANDING WORK ITEMS HAVE BEEN RESOLVED BY REFS E AND F.<br />

6. ESTIMATE (SPECIFIED) DAYS WILL BE REQUIRED TO PERFORM CRITICALITY AND POWER<br />

RANGE TESTING OF NR TWO PLANT. REQ A MAX OF (SPECIFIED) EFPH BE AUTHORIZED.<br />

7. THIS EVENT IS SKED FOR (TIME (LOCAL)) AND (DATE).//<br />

BT<br />

NOTE: ENSURE MESSAGES ARE IN ACCORDANCE WITH NTP-3 FORMAT AND CURRENT<br />

PLAD IS UTILIZED.<br />

NOFORN when filled in<br />

I-2H-2