COMFLTFORCOMINST 4790.3 REV A CH-4<br />

VI-18.6.1 Inflatable Life Rafts • Submit OPNAV 4790/2K for any life raft<br />

requiring replacement or recertification<br />

• Maintain log or database of all life rafts<br />

onboard<br />

• Send report to NSWCCD/TYCOM if life raft<br />

is lost or transferred to another ship<br />

• Ensure life raft fiberglass containers are<br />

handled with care<br />

• Upon decommissioning contact designated<br />

Life Raft Regional Maintenance Activity<br />

• Requisition replacement life rafts when<br />

necessary<br />

VI-23.3.3 Submarine Noise Reduction • Establish and maintain Ship's Noise Reduction<br />

program<br />

• Appoint Senior Department Head as Noise<br />

VI-24.7.5 Periodic Maintenance<br />

Requirement Program<br />

I-FWD-C-24<br />

Reduction Officer<br />

• Responsible for execution of PMR work on<br />

ship<br />

• Document discovered maintenance<br />

deficiencies<br />

• Maintenance deficiencies will reflect block 46<br />

of OPNAV 4790/2K<br />

• Review Depot Availability Work Packages<br />

• Review status of PMR maintenance in<br />

SUBMEPP quarterly PMR schedules<br />

• Deficiencies in equipment covered by PMR<br />

should be documented<br />

• Ensure quarterly PMR schedules and<br />

inventories are carried onboard<br />

• Ensure IMMP MRCs, MSs and TRSs are<br />

referenced and used during equipment<br />

maintenance<br />

• Report repairs to PMR covered components to<br />

ISIC<br />

• Ensure completed AWRs and PMRs are<br />

signed as completed by Ship's Force<br />

VI-25.3.4 Unrestricted Operations • Ensure URO MRCs are accomplished within<br />

required periodicity<br />

• For visual inspections between URO MRC<br />

003 inspections use Volume V, Part I,<br />

paragraph 5.8.3.d<br />

• Maintain auditable records of accomplishment<br />

VI-27.3.4 Scheduled Preservation<br />

Upkeep Coordinated Effort<br />

of URO MRCs<br />

• Ensure preservation is performed using<br />

procedures in references (c) and (e)<br />

• Ensure Ship's Force are relieved of all<br />

requirements except those necessary to<br />

maintain safety and security of ship<br />

• Designate SPRUCE manager<br />

• Ensure ship is divided into preservation zones<br />

• Submit completion letter to TYCOM