13. Propulsion Plant Tests. The full power trial for new construction submarines will be in accordance with<br />

building specifications or directions from the Ship Program Manager. Submarine depth during the submerged<br />

full power trials should be limited to 400 feet. The submerged full power ahead test for commissioned nuclear<br />

powered submarines shall be terminated by a back emergency bell. The duration of the back emergency bell<br />

shall be limited to 45 seconds, to be followed immediately by an appropriate ahead bell. Caution must be<br />

exercised to avoid stern way.<br />

14. Completion of full power, deep dives and EMBT Blow Test Forms are prerequisites for the high speed<br />

maneuverability and steep angle tests. Initial high speed ship control tests, steep angle tests and exercises of<br />

major casualties shall be conducted in water that does not exceed one and one-half times design test depth,<br />

which equates to collapse depth.<br />

15. The spherical array need not be done if an array purge or power into the array measurements are scheduled at a<br />

later date.<br />

16. Fire water slugs from torpedo tubes at the depths and speeds required by the CS/CCS test program (or Combat<br />

Systems Assessment or Non-Propulsion Electronic System Operability, Verification and Evaluation, as<br />

applicable).

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!