I-FWD-C-21<br />

COMFLTFORCOMINST 4790.3 REV A CH-4<br />

IV-17.3.5 Steam Catapult Inspections • Request inspections and recommend dates for<br />

accomplishment<br />

• Prepare for scheduled inspections<br />

• Conduct Ship's Force responsible inspections<br />

• Review inspection results and initiate<br />

corrective actions<br />

• Assess impact of corrective action on ship's<br />

operating schedule<br />

IV-18.3.2 Submarine Salvage Inspection • Request ISIC to conduct salvage inspection<br />

• Coordinate support requirements as needed by<br />

inspection team<br />

• Complete and forward a pre-inspection<br />

information letter<br />

• Assemble all ship's data indicated in<br />

applicable appendix<br />

• Take action to correct discrepancies found<br />

and report corrections to ISIC<br />

IV-20.2.9 Diver Life Support Systems,<br />

Submarine Rescue Chamber<br />

and Dry Deck Shelter<br />

Maintenance and Certification<br />

IV-21.2.3 Submarine Oxygen<br />

Generating Plants<br />

• Submit CASREP if applicable<br />

• Maintain certification of DLSS<br />

• Ensure deficiencies identified during<br />

recertification inspection are corrected in an<br />

expeditious manner<br />

• Readiness of DLSS to meet operational<br />

requirements<br />

• Maintain QA program and re-entry<br />

procedures<br />

• Report reduced status in accordance with<br />

established procedures<br />

• Maintain EOG personnel qualifications<br />

• Prohibit operation of EOGs if necessary<br />

• Maintain EOG material maintenance log<br />

• Ensure EOG material maintenance log is<br />

periodically reviewed<br />

• Safety related deficiencies promptly entered<br />

into ESL<br />

• Prior to availability, ensure PMT conducts<br />

material inspection of EOGs<br />

• Ensure PMT conducts post-availability<br />

material inspection<br />

• Ensure PMT conducts operational inspection<br />

• Ensure electrolysis is secured and EOG is in<br />

safe condition prior to drills involving loss of<br />

power