I-4-9<br />

COMFLTFORCOMINST 4790.3 REV A<br />

e. FCTs are conducted after the ship has been fully equipped, armed, made complete and ready for<br />

service. These trials are normally held just prior to PSA and prior to the end of the guarantee period.<br />

Their objective is to determine if there are any defects, failures or deterioration, other than that due to<br />

normal wear and tear, directly related to shipbuilder fault which have not been corrected or resolved.<br />

The scope of FCTs is essentially the same as AT.<br />

f. A GMI is a material inspection, conducted on submarines prior to PSA by an INSURV in accordance<br />

with reference (f).<br />

g. INSURV reports from previous ships as held by the Supervising Authority provide familiarity with<br />

problems and corrective actions already taken. In addition, these reports provide a baseline for<br />

conducting shipboard inspections and generating inputs for the PCO's monthly progress reports.