05.02.2013 Views

JOINT FLEET MAINTENANCE MANUAL

JOINT FLEET MAINTENANCE MANUAL

JOINT FLEET MAINTENANCE MANUAL

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

APPENDIX C<br />

COMFLTFORCOMINST 4790.3 REV A CH-1<br />

SUMMARY OF MAJOR MILESTONES FOR POST SHAKEDOWN AVAILABILITY<br />

Event Cognizance Approximate Schedule<br />

see Note 1<br />

A. Periodic Monitoring Inspections ISIC/TYCOM Start to completion<br />

B. (Nuclear Powered Ships only) Pre-Criticality<br />

Inspection (required if reactor shutdown greater than<br />

16 weeks)<br />

C. (Nuclear Powered Ships only) Post-Overhaul<br />

Reactor Safeguard Examination (per reference (f) if<br />

reactor shutdown greater than 6 months)<br />

D. Light-Off Assessment (LOA) (if propulsion plant<br />

shut down greater than 120 days)<br />

E. (Nuclear Powered Ships only) Approve Sea Trials<br />

Agenda<br />

ISIC/TYCOM Criticality -4 weeks<br />

Fleet Commander Criticality -4 weeks<br />

Fleet Commander/<br />

TYCOM<br />

-30 days<br />

ISIC/TYCOM -30 days<br />

F. (Submarines only) Salvage Inspection ISIC/TYCOM -28 days<br />

G. (Submarines only) Escort Recommendation Message ISIC/TYCOM -28 days<br />

H. Dock Trials Commanding Officer<br />

(CO) of ship<br />

-21 days<br />

I. Crew Certification (See Note 2) ISIC/TYCOM -9 days<br />

J. (Submarines only) Material Certification (per<br />

Volume V, Part I, Chapter 6, Audit Re-entry<br />

Control, Departure from Specifications, URO MRC)<br />

K. (Submarines only) Crew and Material Certification<br />

Message<br />

L. (Submarines only) Supervising Authority Message<br />

Certifying Material Condition Satisfactory for Fast<br />

Cruise<br />

M. (Submarines only) Ship Program Manager Message<br />

Certifying Systems Satisfactory for Sea Trials and<br />

Depth Authorization<br />

N. (Nuclear Powered Ships only) Message Certifying<br />

Crew and Material Readiness to Ship Program<br />

Manager<br />

I-6C-1<br />

ISIC/TYCOM -9 days<br />

ISIC/TYCOM<br />

(includes H & I<br />

above)<br />

-9 days<br />

Supervising Authority -9 days<br />

Ship Program<br />

Manager<br />

-9 days<br />

TYCOM -8 days

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!