COMFLTFORCOMINST 4790.3 REV A<br />

g. Column "Final" (Ship and Supervising Authority) - This column is used to indicate the final status of<br />

each deficiency at the end of the SCN funded period. This column may be used by the shipbuilder to<br />

report to the Supervising Authority the status of deficiencies at the end of the guarantee period. This<br />

column is used by Supervising Authority to provide the final status of all authorized work (government<br />

and shipbuilder) as reported by the shipbuilder at completion of PSA. This information should be used<br />

as a portion of the Departure Report which is to be forwarded to the Ship Program Manager not later<br />

than 50 days following the end of the ship's PSA. Comments and recommendations by the Supervising<br />

Authority advising correction or non-correction of open items are required.<br />

h. Column "TYCOM" (Final) - This column is used to indicate the action desired by the TYCOM on all<br />

items still open at the end of the PSA period. This data will be reviewed at a "Disposition Conference"<br />

to be convened and chaired by the Ship Program Manager.<br />

i. Column "N/S" (Final) - This column will be used by the Ship Program Manager to report on<br />

agreements made between the TYCOM and the Ship Program Manager during the "Disposition<br />

Conference" for each open deficiency item.<br />

5. The following list of symbols is provided in alphabetical order for ease of use. In the interest of simplification,<br />

many symbols have been combined.<br />

Key Used In The<br />

Following<br />

Columns<br />

Definition<br />

A Ship, TY, PSA Ship Program Manager authorize correction of the item by the industrial activity<br />

as an item for first priority.<br />

B Ship, TY, PSA Ship Program Manager authorize correction of the item by the industrial activity<br />

as a highly desirable second priority item of work.<br />

C Ship, TY, PSA Ship Program Manager authorize correction of the item by the industrial activity<br />

within available funds as third order of priority.<br />

F N/S Action thru<br />

N/S<br />

Forces Afloat to correct using TYCOM funds. This includes TYCOM Alteration<br />

and Improvement (A&I) Items.<br />

FL Final, TYCOM Ship's Force submit request for alteration or request for change to ship's<br />

allowance.<br />

FU Ship, Final Forces Afloat will follow-up on material through procurement and correct the<br />

deficiency.<br />

FV Ship thru Final Forces Afloat will correct with technical assistance from equipment<br />

manufacturer/vendor or the Ship Program Manager.<br />

G N/S Action Government responsible to correct condition noted as necessary to comply with<br />

shipbuilding specifications. No work authorized except by specific Ship Program<br />

Manager action.<br />

I-5B-2