VI-9.2.2 Metrology and Calibration<br />

Program<br />

VI-11.5.1 Maintenance, Repair and<br />

Overhaul of Service Craft,<br />

Landing Craft and Small<br />

Boats<br />

VI-12.3.2.1 Degaussing (ships with<br />

installed degaussing systems)<br />

VI-16.2.2.1.3 Habitability Improvement/<br />

Self Help Responsibilities<br />

VI-19.2.1.1 Ship Maintenance and<br />

Material Management<br />

VI-24.7.1 Periodic Maintenance<br />

Requirement Program<br />

I-FWD-C-7<br />

COMFLTFORCOMINST 4790.3 REV A CH-6<br />

• Assign a METCAL program single point of<br />

contact<br />

• Submit TAMS allowance change requests to<br />

TAMS allowance manager<br />

• Redistribute excess TAMS<br />

• Provide properly trained personnel to<br />

authorized calibration activities<br />

• Periodically perform Quality Assurance<br />

reviews of laboratories<br />

• Manage calibration overflow program<br />

• Ensure Regional Loan Pools are established<br />

• Evaluate FMA/Regional Calibration<br />

Laboratories<br />

• Coordinate for SCAT assignments and<br />

SPETERL revisions<br />

• Assign Fleet Commander representatives<br />

• Coordinate all aspects of advanced planning<br />

• Authorize all new industrial work items<br />

• Authorize growth in existing industrial work<br />

item<br />

• Provide funding for authorized work<br />

• Monitor and approve changes in established<br />

milestones<br />

• Direct action when quality or completeness of<br />

industrial activity work is in question<br />

• Monitor degaussing readiness of assigned ships<br />

• Ensure ships "check range" as required<br />

• Develop Five Year Plan, establish priorities for<br />

attainment of standards<br />

• Plan, schedule, coordinate and monitor projects<br />

• Authorize, budget and fund habitability<br />

program<br />

• Maintenance Data System<br />

• Planned Maintenance System<br />

• Alteration Management System<br />

• (Submarines) TFBR History/Tracking Program<br />

• Maintenance Resource Management System<br />

• PMR Scheduling System<br />

• CSMP<br />

• SNAP I/II/III Organizational Maintenance<br />

Management System<br />

• TRIDENT Logistical Data System/MRMS<br />

Interface<br />

• Master Job Catalog<br />

• Provide overall scheduling system for<br />

accomplishment of PMRs<br />

• Perform periodic audits of ISICs and FMAs<br />

• Provide guidance to ISICs when deviation is<br />

required